Applicable Cooling source in Propose case- LEED Group- v4 C&SCS-2009 EAp2: Minimum Energy Performanceposted by Ashraf Ali Khan Khan on Jun 8, 2017, 7:29 am
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source. For LEED Group... Last reply: Marcus Sheffer, Jun 9, 2017, 9:06 am |
|
Arc PlatformPerformance Periodposted by Sarfaraj Khan on Apr 11, 2017, 8:45 am
Hi Last reply: Batya Metalitz, Apr 12, 2017, 10:45 am |
|
Leed 2009 NC-District cooling path oneNC-2009 EAc1: Optimize Energy Performanceposted by Mark JIN on Mar 20, 2017, 10:53 pm
Dear Friends, I have a project located at Dubai where a localized existing district cooling plant will be providing chilled water. However the DCP supplier is not willing to share any... Last reply: Marcus Sheffer, Mar 24, 2017, 9:48 am |
|
Baseline Pumping PowerNC-2009 EAp2: Minimum Energy Performanceposted by Ahmed Labeeb on Feb 9, 2017, 8:24 am
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mention the effect of pumps' head. the majority of projects that I am working on them, the proposed pumping... Last reply: Marcus Sheffer, Feb 10, 2017, 2:22 pm |
|
Baseline Pumping PowerNC-2009 EAp2: Minimum Energy Performanceposted by Ahmed Labeeb on Feb 9, 2017, 7:52 am
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head. the majority of projects that I am working on them, the proposed pumping... Last reply: Ahmed Labeeb, Feb 9, 2017, 8:06 am |
|
Baseline Pumping PowerNC-2009 EAp2: Minimum Energy Performanceposted by Ahmed Labeeb on Feb 9, 2017, 7:54 am
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head. the majority of projects that I am working on them, the proposed pumping... Last reply: Ahmed Labeeb, Feb 9, 2017, 8:03 am |
|
WHAT IS DIFFERENCE NFRC 100 AND NFRC 200NC-2009 EAp2: Minimum Energy Performanceposted by Ramkrishna kashyap Kashyap on Jan 5, 2017, 1:58 am
ONLY NON-RESIDENCE ALUMINUM FRAME Last reply: Marcus Sheffer, Jan 5, 2017, 9:55 am |
|
Window to wall ratioNC-2009 EAp2: Minimum Energy Performanceposted by Annabelle Cruz on Dec 18, 2016, 1:55 am
Hi. As per Section 5c of Table G3.1 of ASHRAE 90.1-2007, “Vertical fenestration areas for new buildings and additions shall equal that in in the proposed design or 40% of gross above-grade wall... Last reply: Marcus Sheffer, Dec 18, 2016, 9:48 pm |
|
LEED NCv 2009 Multi-Family Residential: ApartmentNC-2009 EAp2: Minimum Energy Performanceposted by junaid naseer on Nov 21, 2016, 3:52 pm
Hi All, I have seen this point tackled in many comments earlier but we still have some doubts. We have a residential building of 16 floors which sits on a podium of 3 floors. Our issues... Last reply: Marcus Sheffer, Nov 22, 2016, 12:36 pm |
|
EAc1 points using DES Option 1 + A lot of RenewablesNC-2009 EAc1: Optimize Energy Performanceposted by Reniel Barroso on Aug 11, 2016, 1:54 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5738 thumbs up August 31, 2016- 11:45 am Answered in the EAp2 forum. Log in or register to post comments ... Last reply: Marcus Sheffer, Aug 31, 2016, 11:45 am |