Nonattainment area for PM2.5EBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Sarah Birchall on Sep 2, 2020, 12:43 pm
How do I find out if my project (which is located in the UK) is in a nonattainment area for fine particulate matter (PM2.5)? |
|
Occupancy within the Minimum_IAQ_Performance_CalculatorData-Centers-NC-v4 EQp1: Minimum indoor air quality performanceposted by Sarah Birchall on Aug 11, 2020, 10:28 am
For the occupancy within the Minimum_... |
|
U.S. Department of Energy’s (CBECS) database- data on the websiteCI-v4 EAc6: Green power and carbon offsetsposted by Karen Elliott on May 13, 2019, 4:51 am
Dear All We used prescriptive option on Minimum Energy Performance, so looking to calculate out energy use via U.S. Department of Energy’s Commercial Buildings Energy Consumption Survey (... Last reply: Marcus Sheffer, Aug 11, 2020, 8:48 am |
|
Four buildings in one certification?Mid-Rise-v4 MPR2: Must use reasonable LEED boundariesposted by Maria Perzon on Jan 13, 2020, 10:31 am
I am working with a customer discussing LEED certification for four similar residential buildings. They have only minor variations. Would it be possible to lower the costs by certifying it as one... Last reply: Samuel Sura, Aug 10, 2020, 9:15 am |
|
Minimum planted area (that needs no irrigation)CS-v4 WEc1: Outdoor water use reductionposted by Maria Porter on Oct 30, 2017, 8:05 am
Hi! In v2009 there used to be a 5 % minimum for the area that needed to be planted in order for the project to be eligible for the credit. Is there such a threshold now? Or does basically... Last reply: Maria Porter, Aug 10, 2020, 8:01 am |
|
Batteries, mercury-containing lamps, and electronic wasteNC-v4 MRp1: Storage and Collection of Recyclablesposted by Maria Porter on Dec 19, 2019, 7:11 am
Chose to provide a recycling area for two of: batteries, mercury-containing lamps, and... Last reply: Holly Ratafia, Jul 2, 2020, 11:12 pm |
|
Additonal Interior Lighting PowerRetail-CI-v4 EAc2: Optimize Energy Performanceposted by James Pack on Jul 1, 2020, 7:11 am
We are trying to calcuate the additional allowance for Display Lighting in a Jewellery store. When calcualting the allowance does the W/ft2 cover the individaul display area (display shelves /... Last reply: Marcus Sheffer, Jul 2, 2020, 9:19 am |
|
Exemplary Performance ParkingCI-v4 INc1: Innovationposted by James Pack on Jun 30, 2020, 5:46 am
Can we achieve exemplary performance for Parking if we are acheiving credit by default due to no parking possible? |
|
Is this a Design or a Construction credit?CS-v4.1 EAc5: Renewable energyposted by Maria Porter on Jun 18, 2020, 5:57 am
Hi, Is this a design credit or a construction credit? Wanting to substitute v4 “Renewable energy” (a design credit) and “Green power and carbon offsets” (a construction credit) with this... Last reply: Maria Porter, Jun 22, 2020, 3:07 am |
|
LEED EBOM v4 minimum occupancy requirementsEBOM-v4 EAp2: Minimum Energy Performanceposted by on Jun 16, 2020, 10:22 am
Hello, Does LEED EBOM v4 require a minimum occupancy requirement to be able to be certified? Our building is fairly new and we are aware of the full 12 months energy use. The... Last reply: Patrick Murisset, Jun 16, 2020, 2:59 pm |