Topic | Recent |
---|---|
Campus approach: can we install water meter for the entire landscape, sanitaryware as a wholeNC-v4 WEc4: Water meteringposted by Michael on Aug 25, 2022, 5:37 am
My project is a campus project, consisting of 4 individual buildings. To fulfill this credit, can I install 1 meter to monitor sanitaryware for 4 buildings together as a whole? or I have to split... Last reply: Maeve Donohue, Aug 25, 2022, 9:21 am |
|
need of two excel file to show daylight compliance?NC-v4 EQc7: Daylightposted by Alwin Jino on Aug 19, 2020, 6:59 am
As per Version 4.1, IEQ Credit-Daylight: Options 2, Illuminance calculations. it is asked to perform daylight simulation for 9 a.m and 3 p.m on a clear-sky day at the equinox. should we... Last reply: Debra a. Lombard, Aug 24, 2022, 4:39 pm |
|
Solar energy still doesn't count toward to minimum energy reduction in v4?NC-v4 EAp2: Minimum Energy Performanceposted by Michael on Aug 24, 2022, 7:08 am
My understanding is that LEEDv4.1 allows on-site renewables to count toward compliance in the prerequisite. I'm wondering if LEEDv4 also allows to do so or we still have to reach the minimum... Last reply: Marcus Sheffer, Aug 24, 2022, 11:52 am |
|
Calculate U-value of exterior wallNC-v4 EAp2: Minimum Energy Performanceposted by Michael on Aug 23, 2022, 11:55 pm
Regarding the... Last reply: Marcus Sheffer, Aug 24, 2022, 11:50 am |
|
Is Rainwater Cistern acceptable as LID Techniques?NC-v4.1 SSc4: Rainwater managementposted by Michael on Mar 21, 2022, 12:11 pm
Hi LEED experts, I read v4.1 "Further explanation", in the first section "Examples of Acceptable... Last reply: emily reese moody, Aug 22, 2022, 12:09 pm |
|
Two unidentical buildings from same owner/management for what approach?EBOM-v4 MPR2: Must use reasonable LEED boundariesposted by Eric Bautista on Aug 14, 2022, 11:45 pm
I would like to emphasize the general details of this project for LEED v4 or v4.1 O+M certification. There are 2 existing buildings (Building A and B) in a property boundary and these are ... |
|
Modeling a warehouse that is divided into multiple typical unitsCS-v4 EAc2: Optimize Energy Performanceposted by Michael on Aug 12, 2022, 4:40 am
My project is a big dry warehouse, which is divided into 7 typical units for future tenants. There is a small office with AC in each unit. My question is can we model 1 typical unit, then... Last reply: Marcus Sheffer, Aug 12, 2022, 9:37 am |
|
Baseline system selection for data center project above 1,50,000 sqft of area.Data-Centers-NC-v4 EAc2: Optimize Energy Performanceposted by Rameez Lal on Jul 19, 2022, 4:52 am
I have came across a paper which says even if the white spaces(data halls) in a data centre building constitute the majority area of the project, the system selection for white spaces can be... Last reply: Tyler Thumma, Aug 11, 2022, 10:41 am |
|
LEED 4.1 NC Energy and AtmosphereNC-v4.1 EAc5: Renewable energyposted by Britt Valdez on Feb 21, 2020, 11:03 am
Hi, related to LEED 4.1 NC Energy and Atmosphere requirements: When purchasing Renewable Energy Credits (RECs) and/or carbon offsets, there is a one-year term option and a fifteen-year term... Last reply: Marcus Sheffer, Jul 15, 2022, 11:33 am |
|
Floor markings/signage on grass cellsNC-v4 LTc8: Green vehiclesposted by Zirjay Villanueva on Jan 21, 2022, 12:31 am
Hi, Has anyone tried putting floor markings on grass cells/pavers to indicate the reserved parking spots for... Last reply: , Jul 14, 2022, 10:30 am |