Log in
Forum » Middle East
Topic

Prefabricated or modular structure Buildings

NC-v4 MPR1: Must be in a permanent location on existing land
posted by VISHAL JAIN on Aug 17, 2022, 8:53 am

Hello,

Would like to know more details on how "Prefabricated or modular...

Decorative lighting fixtures

NC-v4.1 EQc6: Interior lighting
posted by Ellis John Mandia on Aug 9, 2022, 6:32 am

Are decorative lighting fixtures such as chandeliers, wall sconces, and table lamps, that are within regularly occupied space included in the requirements to comply with luminance of less than 2,...

Last reply: Glenn Heinmiller, Aug 9, 2022, 11:50 am

Advanced Energy Metering Owner & Tenant spaces

CS-v4 EAc3: Advanced Energy Metering
posted by Aishwarya Chengappa on Jul 20, 2022, 2:24 am

I have a G+6F C&S office building with 2 office spaces in each floor, which will be metered separately as per the local law. Although the owner of the building will be accommodating one of...

Last reply: Marcus Sheffer, Jul 22, 2022, 11:17 am

LEED OM V4.1 Location problem

EBOM-v4.1 LTp1: Transportation Performance
posted by Saba Hajizadeh on Jun 21, 2022, 6:14 am

Hello everyone,

I'm working on a project, the location of this building is Iran, but I couldn't find it on the ARC website. Do you have any suggestions? What should I do?

...

Compliance of Lighting fixtures

NC-v4.1 EQc6: Interior lighting
posted by Ellis John Mandia on May 23, 2022, 1:52 am

Hello all,

Here is a actual problem I have encountered. What will happen if the lighting consultant has provided the necessary documents that comply with all the requirements for the...

Different Baseline HVAC System

NC-v4 EAp2: Minimum Energy Performance
posted by Amal Venugopal on May 17, 2022, 4:50 am

Greetings!..

We have begun the energy modeling for factory building. In addition to the factory, the building houses a warehouse and an administration office. The building has 2,00,000...

Last reply: Marcus Sheffer, May 17, 2022, 9:31 am

District cooling chilled water

CS-v4 WEc2: Indoor water use reduction
posted by Dina El-Sady on Apr 27, 2022, 6:42 am

If the project is served by a district cooling plant outside LEED project boundary , does the chilled water count as process water and needs to be included in water efficiency calculations?

Last reply: emily reese moody, May 13, 2022, 7:32 pm

Hospitality Rating

LEED Rating System Selection
posted by RIMA BOUDABA on Apr 29, 2022, 2:14 am

Hi 

I have one resort (43000 sqm) in Riyadh- Saudi Arabia, one palace with 81% refusrbishment and 10 new villas around the palace.

I would like to confirm first if the BD+C...

Uplights in an LZ0 zone

NC-v4.1 SSc6: Light Pollution Reduction
posted by Ellis John Mandia on Apr 11, 2022, 8:36 am

Can the percentage values prescribed in the "Maximum allowed percentage of total luminaire lumens emitted above horizontal" be taken as time-related? For example, if we have uplights in a LZ0...

Last reply: Bill Swanson, Apr 21, 2022, 9:13 am

LEED Campus V4 Matrix

LEED Guidance for Campuses and Multiple Buildings
posted by sana salman on Apr 18, 2022, 7:05 am

Hello , 

Does anyone have LEED v4 campus matric for BD+C. I downloaded LEED guidance for Campus but it has credits and Matrix for LEED 2009. 

also can i register the campus with...

Last reply: Erin Holdenried, Apr 18, 2022, 9:55 am