Topic | Recent |
---|---|
Site with no existing greenfieldCS-v4 SSc2: Site development - protect or restore habitatposted by Agustin Bertolotti on Mar 9, 2023, 9:01 am
Hi everyone We are working on a site which is previously developed with no existing... |
|
Recertifying a leased buildingLEED Rating System Selectionposted by Bill Potter on Mar 7, 2023, 11:25 am
Our company leases an office building where we are the sole tenants of the buidling. The project was originally certified as ID+C: Commercial Interiors, i belive by the Architecture firm when the... Last reply: emily reese moody, Mar 8, 2023, 7:54 pm |
|
Unregulated loadsCS-v4 EAp2: Minimum Energy Performanceposted by Julio Fernandez Amodia on Mar 8, 2023, 2:23 pm
Dear all, I am currently assessing al the unregulated loads in a mall building. In this case there is a large type of spaces, such as restaurants, fitness center, spa, retail, department... Last reply: Marcus Sheffer, Mar 8, 2023, 3:11 pm |
|
BUG Method ClarificarionNC-v4 SSc6: Light Pollution Reductionposted by Mankisha Veng Veng on Mar 17, 2022, 10:56 amthe wall then this credit is not compatible. https://leeduser.buildinggreen.com/forum/government-mandated-fixtures-ex... Log in or register to post comments Aviv Nitzan LEEDuser Premium Member March 8, 2023-... Last reply: Glenn Heinmiller, Mar 8, 2023, 12:47 pm |
|
INpc138 Safety First Pilot Credit TransitionPilot-Credits INpc138: Managing Indoor Air Quality for Infection Controlposted by Barry Abramson on Mar 8, 2023, 6:01 am
We have pursued this pilot credit several times for client buildings. It was extremely relevant during the height of the pandemic but has ongoing importance. Very pleased that USGBC has... |
|
permanently installed building productsWarehouses-NC-v4.1 MRc3: Sourcing of Raw Materialsposted by Cecile de Villemeur on Mar 7, 2023, 1:08 pm
Hello, Could you tell me which products should be included in the permanently installed building products ? I think that technical equipment (HVAC or electric) shouldn't be included... Last reply: Cecile de Villemeur, Mar 7, 2023, 4:16 pm |
|
Pilot Credit: Carbon sequestration through on site plantingNC-v4 INc1: Innovationposted by Emily Purcell on Mar 7, 2023, 11:43 am
I have calculated this credit for a few projects and am sharing my comments: - Overall the calculator is easy to use. On urban projects with limited landscaping area, it can be challenging... Last reply: Deborah Lucking, Mar 7, 2023, 12:06 pm |
|
EV Charger has demand response capability but is not Energy StarNC-v4.1 LTc8: Electric Vehiclesposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Mar 7, 2023, 11:53 am
Hi All, To clarify language for this credit, does "Meet the connected functionality criteria for ENERGY STAR certified EVSE and be capable of responding to time-of-use market signals (... |
|
Existing MultiFamily High Rise-Exclude Occupied Commerical SpaceHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Laura Steinbrink on Aug 11, 2016, 8:29 am
We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted. The ground floor has approximately 5 commercial/... Last reply: Lusjena Cakeri, Mar 7, 2023, 11:30 am |
|
Core & Shell mandatory provisionsCS-v4 EAp2: Minimum Energy Performanceposted by Julio Fernandez Amodia on Mar 6, 2023, 1:46 pm
Hi to all, I am currently assessing a mall LEED compliance. This is a C&S LEED project with retail units as tenant spaces where the owner has no control. I was wondering if the ASHRAE... Last reply: Ashish Nautiyal, Mar 7, 2023, 11:27 am |