Log in
Forum » NC-2009 EAc5
Topic

Developing the plan post-construction

NC-2009 EAc5: Measurement and Verification
posted by Maura Adams on Jan 10, 2012, 3:51 pm

Is there any reason that we couldn't develop an M&V plan post-construction, assuming we have the necessary controls in place?

Last reply: Marcus Sheffer, Jan 10, 2012, 4:20 pm

Energy Star Portfolio Manager Naming

NC-2009 EAc5: Measurement and Verification
posted by April Ambrose on Aug 11, 2011, 4:01 pm

PIf4 says: Note: Project titles in portfolio manager must be the same as the LEED registered project name. Projects must also include their LEED project identification number in the notes portion...

Last reply: Marcus Sheffer, Oct 25, 2011, 3:09 pm

Option 3- Whole Building Reporting / Energy Star PM

NC-2009 EAc5: Measurement and Verification
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Oct 25, 2011, 10:58 am

Energy Star Portfolio Manager does not cover all building types. Were a building to not fall into an Energy Star category, is it allowed to simply report the whole building energy and water use...

Last reply: Marcus Sheffer, Oct 25, 2011, 11:35 am

M&V plan- Option D vs. Energy Standard

NC-2009 EAc5: Measurement and Verification
posted by André Knutsson on Oct 24, 2011, 2:32 am

Our LEED project is situated in Norway. We had to run energy simulations after ASHRAE 90.1-2007 for LEED purposes. However the "real" energy simulations for the building is run after NS3031:2007...

Last reply: André Knutsson, Oct 25, 2011, 1:31 am

It doesn't seem like this

NC-2009 EAc5: Measurement and Verification
posted by Maura Adams on Aug 16, 2011, 10:33 am

It doesn't seem like this credit should be so complicated. We have a full DDC system in the new building, which is part of a campus. We already have a Honeywell team on site to monitor other...

Last reply: Marcus Sheffer, Sep 19, 2011, 6:15 pm

Highrise condo- What to monitor and meter

NC-2009 EAc5: Measurement and Verification
posted by Rob Hink on Sep 8, 2011, 7:57 pm

With a 54 unit highrise condo, what would be acceptable to meter to meet the requirements of the credit. Individual unit electric meters? I can't imagine putting CTs on 130 individual heat pump...

Last reply: Marcus Sheffer, Sep 19, 2011, 6:12 pm

Option 3, if no whole bldg. utility meter is installed?

NC-2009 EAc5: Measurement and Verification
posted by Sebastian Graba on Aug 4, 2011, 4:38 pm

How can I apply for Option 3, if my project doesn't a whole building utility meter installed? Our LEED building is located on a "campus". So the campus does have a utility meter installed.

...

Last reply: David Eldridge, Aug 4, 2011, 6:52 pm

How much flexibilty do you have with what gets sub-metered?

NC-2009 EAc5: Measurement and Verification
posted by R. Ted Krasnesky on Jun 16, 2011, 3:46 pm

Say you have a fairly complex project, but the facility engineers only want to sub-meter 7 electrical systems for measurement and verification. The rest of the energy will be monitored through...

Last reply: David Eldridge, Jun 16, 2011, 6:13 pm

Option D: Baseline Model

NC-2009 EAc5: Measurement and Verification
posted by Maya Karkour on Dec 16, 2010, 12:23 pm

Hello,

I have some questions regarding Option D - Calibrated Simulation:

1) Can we use the ASHRAE 90.1-2007 baseline used in EA cr 1 -Option1 as the M&V baseline ?
2) I...

Last reply: Marcus Sheffer, Apr 6, 2011, 9:07 am

M&V data reporting

NC-2009 EAc5: Measurement and Verification
posted by Joseph Greene on Mar 18, 2011, 4:35 pm

Please verify the reporting period is 1 year and not 2. Your sample M&V plan talks about a two year M&V period.
Are templates available for data reporting and is there a required...

Last reply: Marcus Sheffer, Mar 18, 2011, 5:40 pm