Topic | Recent |
---|---|
Residential Building (9-Story)NC-v4 EQp1: Minimum indoor air quality performanceposted by CT G on Feb 2, 2021, 12:49 pm
We are working on a 9-story residential project that is being certified v4 BD+C: New Construction. The spaces (including all dwelling units) are cooled by VRF indoor units and heated by radiant... Last reply: Dave Hubka, Feb 2, 2021, 4:06 pm |
|
Radon Requirements for LEEDv4 Residential UnitsNC-v4 EQp1: Minimum indoor air quality performanceposted by Jessica Malta on Jan 27, 2021, 11:21 am
Hi, We are working on a high-rise MURB project and trying to meet the radon requirements outlined in the reference guide. The reference guide has listed 5 different standards (EPA Building... |
|
Output report from simulation software in lieu of calculator?NC-v4 EQp1: Minimum indoor air quality performanceposted by RDK E&S on Dec 12, 2019, 3:05 pm
Hello! We are working on a residential project and are hoping to use the 62.1 Summary from DesignBuilder in lieu of the Minimum Indoor Air Quality Performance Calculator. Has anyone had success... Last reply: Jill Kurtz, Jan 22, 2021, 1:00 pm |
|
Filtration Requirement for a Evaporative Cooling SystemNC-v4 EQp1: Minimum indoor air quality performanceposted by Krithikha Muthukrishnan on Dec 28, 2020, 5:32 am
Hi, We are working on a Project which is a large scale Manufacturing space. The Project is planning to install a direct only Evaporative Cooling system which draws in Outside air directly... Last reply: Krithikha Muthukrishnan, Dec 29, 2020, 5:52 am |
|
Demand Controlled VentilationNC-v4 EQp1: Minimum indoor air quality performanceposted by Nancy Henderson on Dec 15, 2020, 7:05 pm
We have demand controlled ventilation in spaces with varying occupancy. The building is a YMCA. The controls contractor set the... Last reply: Nancy Henderson, Dec 16, 2020, 5:19 pm |
|
Dedicated Kitchen ExhaustNC-v4 EQp1: Minimum indoor air quality performanceposted by colleen soden on Jan 12, 2018, 4:12 pm
We have a low rise (4 story) multifamily residential project considering LEED v4 BD+C in Boston. The ventilation system is a constant-volume dedicated outdoor air system with heat recovery, which... Last reply: Megan Kris, Nov 11, 2020, 5:59 am |
|
Mixed Model, Mechnical ventilation designNC-v4 EQp1: Minimum indoor air quality performanceposted by Sandra Lee on Oct 26, 2020, 4:30 pm
Hello all: I am a newbie here so may this question was brought up. We have a building with a canteen for workers. The canteen uses AHUs to provide outdoor air, but the total cfm does not... |
|
IEQ PreReq- Carbon monoxide monitoringNC-v4 EQp1: Minimum indoor air quality performanceposted by Kim C on Oct 11, 2018, 1:59 am
The pre-requisite criteria speaks of having Carbon monoxide monitors installed in each dwelling unit. However, it is not common for dwelling units in Malaysia/Singapore to have such... Last reply: Rodolfo Loro, Jr., Oct 15, 2020, 12:47 am |
|
Radon resistant construction for first 4 stories above grade.NC-v4 EQp1: Minimum indoor air quality performanceposted by Sue Bryant on Sep 15, 2020, 8:09 pm
|
|
CLASS 1 AIR SEPERATION DISTANCES_62.1 2010NC-v4 EQp1: Minimum indoor air quality performanceposted by Fotis Kotsopoulos on Aug 25, 2020, 12:24 pm
In case of a central... |