How to model process chilled water load?NC-v4 EAp2: Minimum Energy Performanceposted by Eric Dixon on Jul 15, 2024, 8:51 pm
My proposed design for lab utilizes a heat recovery chiller connected to geo-exchange. There is a 40 ton process chilled water load on the heat recovery chiller. The baseline system for this... Last reply: Tyler Thumma, Jul 18, 2024, 9:46 am |
|
U value compliance for Revolving DoorsNC-v4 EAp2: Minimum Energy Performanceposted by Alokmay Behera on Oct 23, 2023, 4:37 am
I am working on a LEED project with revolving doors. The targetted U value for glaze is 1.9 W/Sqft.K (including frames),... Last reply: Afogreen Build, Jul 9, 2024, 1:04 am |
|
District cold storage projectNC-v4 EAp2: Minimum Energy Performanceposted by Ryan Wang on Jun 21, 2024, 2:49 am
Hi all experts, I'm working on 4 cold storage warehouses which all the cooling source form one refrigerating planttoom, i guess i should consider it as the "district cold storage" ,... Last reply: Marcus Sheffer, Jun 25, 2024, 3:27 pm |
|
GHG Emission parametersNC-v4 EAp2: Minimum Energy Performanceposted by A&L SUSTENTABILIDADE on May 3, 2024, 4:02 pm
I have some questions regarding greenhouse gas (... Last reply: Victor Catrib, May 7, 2024, 11:26 am |
|
Baseline system type for project that will retain part of an existing HVAC systemNC-v4 EAp2: Minimum Energy Performanceposted by Camilo Velez on May 4, 2024, 12:16 pm
Hi all, We are working on an existing small project (35,000 SF approx) that is going through a major renovation, where most of its systems are being updated, including new AHUs, however,... Last reply: Tyler Thumma, May 7, 2024, 8:34 am |
|
Outdoor air in the Baseline ModelNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Apr 17, 2024, 3:06 pm
Hi , I am working on a lab space with 100% OA , for these spaces Cooling load is driving airflow, now the OA that we calculated for Proposed case is not sufficient to maintain the setpoint in the... Last reply: Rajat Wadhwa, Apr 18, 2024, 12:22 pm |
|
Kitchen Baseline SystemNC-v4 EAp2: Minimum Energy Performanceposted by Saif Abdulameer on Jun 11, 2018, 4:19 pm
I am working on a hotel where system 6 is the baseline for the podium, one of the spaces is a kitchen served by a single zone... Last reply: Emma Zhang, Apr 11, 2024, 5:01 pm |
|
getting hot water from CHP, but not the power. Can I still get the credit of the power produced?NC-v4 EAp2: Minimum Energy Performanceposted by Moses Chong on Apr 4, 2024, 5:31 pm
Hi! My project is getting hot water from the central... Last reply: Tyler Thumma, Apr 9, 2024, 8:19 am |
|
Designing Baseline with Natural Ventilation using IDA-ICENC-v4 EAp2: Minimum Energy Performanceposted by Azra on Feb 7, 2024, 3:31 am
Hi, Last reply: Tyler Thumma, Apr 5, 2024, 11:37 am |
|
How to report High COP values for ChillersNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Jan 25, 2024, 4:05 pm
Hi I am working on a Data Center in Chicago, and we have Chillers which have a high COP when the ambient temperature is low outside, so The energy modeling software that I am using can ony get as... Last reply: Tyler Thumma, Apr 5, 2024, 10:59 am |