Phased Development- Demoing Building for Parking Lot

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Deb Favaretto on Jul 20, 2022, 12:52 pm

Hi,

I am working on a project that has a two phases of construction. Phase 1 consists of constructing a new building and sitework. Phase 2 involves demolishing an existing building and...

Last reply: David Hubka, Aug 13, 2022, 9:23 am

62.1 vs 170

NC-v4 EQp1: Minimum indoor air quality performance
posted by Dianne Herrin on Sep 26, 2016, 10:11 am

Hello - I am working on a new construction VA Medical Center that has been designed using the ventilation rates in ASHRAE Standard 170-2008 as per the v4 NC-Healthcare. Can we still qualify for...

Last reply: Michelle Bombeck, Aug 12, 2022, 4:48 pm

Glare Control for Regularly Occupied Spaces

NC-v4.1 EQc6: Interior lighting
posted by Lauren Kottis on Feb 7, 2022, 9:58 am

"For all regularly occupied spaces, meet one of the following requirements:  

  1. Use light fixtures with a luminance of less than 7,000 candela per square meter (cd/m)2 between...

Last reply: Karen Joslin, Aug 12, 2022, 3:42 pm

Low Emitting Materials Calculator and Precast Wall Panels

NC-v4 EQc2: Low-emitting materials
posted by Teaaron Frye on Aug 11, 2022, 3:41 pm

In regards to the low emitting materials calculator (v4.1) what is the proper way to document insulated and non-insulated precast concrete wall panels. 

Last reply: Jack Statham, Aug 12, 2022, 11:59 am

RECs for project supplied by campus central utility plant?

NC-v4 EAc7: Green power and carbon offsets
posted by Erin Holdenried on Jul 20, 2022, 4:11 pm

Can RECs be used for project located on a campus with a central plant that generates its own electricity for the campus?  It is a cogen plant that also supplies steam and chilled water.

Last reply: Erin Holdenried, Aug 11, 2022, 5:53 pm

Water metering v4.0 Janitor's closet water usage

CS-v4 WEc4: Water metering
posted by Alicia Ravetto on Aug 1, 2019, 10:50 am

Reviewer wrote: "Provide narrative confirming that the janitor's closet water usage has not been addressed within the metering capacity and that at least 80% of the indoor plumbing fixtures and...

Last reply: Devendra Chaughule, Aug 11, 2022, 1:55 am

Zone Discharge and Zone Primary Airflow

NC-v4 EQp1: Minimum indoor air quality performance
posted by Luke Brooman on Apr 21, 2021, 10:58 am

I am looking for clarification on the Zone Discharge Airflow (Vdz) and Zone Primary Airflow (Vpz) values under the multiple zone systems. The spreadsheet note for Vdz states it is the expected...

Last reply: Devendra Chaughule, Aug 10, 2022, 9:29 pm

ASHRAE 90.1 all electric baseline?

NC-v4 EAp2: Minimum Energy Performance
posted by Kevin Gilleran on Jul 27, 2022, 9:48 am

Hi all,

Situation:

Working on an all electric urban community college classroom building. The domestic water heating is provided by a series of heat pump water heaters. The domestic...

Last reply: Marcus Sheffer, Aug 8, 2022, 10:37 am

Anyone been through full review of this credit yet?

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Joanna Switzer on Oct 26, 2017, 2:57 pm

in or register to post comments 0 Vote up! Based on forum comments (and my own previously approved project experience) I see that several projects have achieved this Pilot using three different paint products....

Last reply: James Keohane, Aug 5, 2022, 4:41 pm

Perimeter light levels affected by surrounding sites.

EBOM-v4.1 SSc3: Light Pollution Reduction
posted by Rick Walls on Aug 4, 2022, 10:35 am

The perimeter light levels are driven by the surrounding light sources such as street lights and adjoining building lights.  Do I need to make note of these factors in the credit form?

Last reply: Bill Swanson, Aug 5, 2022, 9:38 am