Topic | Recent |
---|---|
v4.1 Low-Emitting Calculator??NC-v4.1 EQc2: Low-emitting materialsposted by Sara Greenwood on Jun 21, 2019, 5:34 pm
Does anyone have access to a v4.1 low-emitting calculator? Since some categories are now quantified by cost, volume, or square footage it warrants a different calculator. Last reply: Judy Chin, Jun 10, 2023, 9:43 pm |
|
Healthcare renovationLEED v4.1 Discussion Forumposted by Denise Thompson on May 6, 2021, 7:49 pm
Hi, we're renovating 2 of the floors of an ... Last reply: , Jun 5, 2023, 1:40 pm |
|
What equipment does "Discharge water temperature tempering" pertain to?NC-v4 WEp2: Indoor water use reductionposted by Glen Boldt on Jun 2, 2023, 8:19 pm
We are working on a hotel project. I can see where tables 2 and 4 relate directly o clothres washin gnas kitchen equipment, but I wonder about table 5 - Discharge water temperature tempering. ... |
|
Thermal Comfort controlNC-v4 EQc5: Thermal comfortposted by Gail Napell on Sep 2, 2018, 2:56 am
has anyone achieved this credit through Comfy or a similar ap? Last reply: Greg Romanczyk, May 26, 2023, 11:36 am |
|
Exemption for workshop spaces?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Adrienne Franz on May 23, 2023, 4:42 pm
We are doing a building where half the building is offices and the other half is workshops for parks maintenence staff. (I'm talking mechanical, carpentry, tree crew). These rooms have 2 Hollow... |
|
If a parcel crosses the 1/4 mile radius, does it count?CS-v4 LTc4: Surrounding density and diverse usesposted by Armond Dai on May 19, 2023, 5:04 pm
On the map I ploted a 1/4 mile radius from the project boundary. There are lot of parcels of buildable land that are partially within the radius and partially outside the radius. Do I include... Last reply: Emily Purcell, May 22, 2023, 11:22 am |
|
Temperature SensorCI-v4 EQc5: Thermal comfortposted by Edgar Arevalo on May 17, 2023, 4:45 pm
I have a dilemma for a library project i'm working on. It seems the MEP designer added temperature sensors (wall or ceiling mounted) in the reading areas. These don't have any way to adjust... |
|
Water metering v4.0 Janitor's closet water usageCS-v4 WEc4: Water meteringposted by Alicia Ravetto on Aug 1, 2019, 10:50 am
Reviewer wrote: "Provide narrative confirming that the janitor's closet water usage has not been addressed within the metering capacity and that at least 80% of the indoor plumbing fixtures and... Last reply: Kelli Kimura, May 15, 2023, 5:48 pm |
|
Project Size RequirementsHomes-v4 MPR3: Must comply with project size requirementsposted by LeeAnn Sendra on Nov 18, 2022, 8:17 amPaula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 179 thumbs up November 18, 2022- 9:02 am Hi, LeeAnn! I usually discourage cross posting (the duplicates could get out of hand), but in your case I would recommend also posting your question on the LEED Rating System Selection forum because more people are likely to see it there. Good luck! Log in or register to post comments Brett Little Education Manager GreenHome Institute LEEDuser Basic Member 3 thumbs up May 14, 2023- 2:17 pm Did you ever find a rater / provider to help you? Log in or register to post comments ... Last reply: Brett Little, May 14, 2023, 2:17 pm |
|
Design stage of the submitted LCA analysis?NC-v4.1 MRc1: Building life-cycle impact reductionposted by on May 10, 2023, 1:53 pm
I couldn't find any mention of requirements for the design stage of the submitted LCA analysis. If the LCA is performed during DD, say, and not much significant has changed to the design through... Last reply: Bipin Karki, May 11, 2023, 3:01 pm |