Topic | Recent |
---|---|
Indoor unit power calculationNC-2009 EAp2: Minimum Energy Performanceposted by SSN Energy Model on Nov 21, 2017, 9:09 am
Hi, I am doing Energy Model for car showroom which is LEED Gold Rating. Proposed HVAC System is Packaged Units and Split units. I have received the EER, Total Cooling capacity, sensible... Last reply: Marcus Sheffer, Nov 21, 2017, 1:33 pm |
|
Parking Garage (VFD with CO sensor) exceptional calculation MethodNC-2009 EAp2: Minimum Energy Performanceposted by Manivel Natarajan on Nov 13, 2017, 4:35 am
Hi Team, Greetings! The project has propsoed one of the... Last reply: Chilufya Lombe, Nov 14, 2017, 2:30 am |
|
How many points can be claimed if project is served with 100% Renewable Energy for EAC1?NC-v4 EAc2: Optimize Energy Performanceposted by Ashraf Ali Khan Khan on Nov 9, 2017, 11:23 am
How many points can be claimed if project is served with 100% Renewable Energy? For LEED V4 NC, we need to demonstrate 5% of Energy Savings compared to ASHRAE Baseline through Energy... Last reply: Marcus Sheffer, Nov 10, 2017, 1:35 pm |
|
LEED CS V4 Design of Snow parkCS-v4 EAp2: Minimum Energy Performanceposted by Shahana Sayed on Oct 16, 2017, 7:55 am
What should be the EAp2 baseline consideration for snow park/ski park within a mall in UAE. Last reply: Marcus Sheffer, Oct 18, 2017, 10:31 am |
|
Mechanical Equipment FinishesNC-v4 EQc2: Low-emitting materialsposted by Samer Alhmdan on Aug 7, 2017, 6:24 am
Hello, Does this credit apply to the Mechanical Equipment Finishes ( Flooring, and Walling) for example Lifts finishes. Last reply: Ashwini Arun, Sep 12, 2017, 1:48 pm |
|
Minimum Indoor Air Quality Performance CalculationNC-v4 EQp1: Minimum indoor air quality performanceposted by Amal Venugopal on Jul 4, 2017, 7:53 am
My Project has one FAHU on roof which is supply treated Fresh air to all... Last reply: Christopher Schaffner, Aug 31, 2017, 2:23 pm |
|
LEED CI v3- Ofice- Energy Model. Please AdviseCI-2009 EAc1.3: Optimize energy performance - HVACposted by SSN Energy Model on Aug 14, 2017, 7:29 am
Hi, Last reply: Marcus Sheffer, Aug 23, 2017, 2:08 pm |
|
Applicability within campus boundary limitsNC-v4 SSp1: Construction Activity Pollution Preventionposted by Samer Alhmdan on Jul 25, 2017, 2:59 am
Hello, Last reply: Trista Brown, Jul 25, 2017, 6:47 pm |
|
PV panels on RoofCS-v4 SSc5: Heat Island Reductionposted by Andrea Tirao on Jul 6, 2017, 3:12 am
Hi, Last reply: Summer Minchew, Jul 12, 2017, 10:04 am |
|
LEED Group C&S- Applicable Cooling source in Propose caseCS-v4 EAp2: Minimum Energy Performanceposted by Ashraf Ali Khan Khan on Jun 8, 2017, 8:13 am
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source. For LEED Group... Last reply: Marcus Sheffer, Jun 9, 2017, 9:06 am |