Inspection Reports- responsible partyNC-2009 SSp1: Construction Activity Pollution Preventionposted by komal kotwal on Sep 1, 2016, 11:28 am
Is it required that the on-site inspection be conducted by a third party or can a Contractor's representative conduct the same? Last reply: James Wilson, Jan 8, 2017, 12:22 pm |
|
green power sourceNC-2009 EAc6: Green Powerposted by sherif el adly on Dec 1, 2016, 12:34 pm
The client have a solar park in a land adjacent to the land on which the project will be built. The client has the ability to increase the LEED boundary and add the two lands such that this solar... Last reply: Marcus Sheffer, Dec 1, 2016, 2:10 pm |
|
water cooled chilllerNC-2009 EAp2: Minimum Energy Performanceposted by sherif el adly on Dec 1, 2016, 11:53 am
Hi Marcus The building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller... Last reply: Marcus Sheffer, Dec 1, 2016, 12:40 pm |
|
modeling with air cooled chillerNC-2009 EAp2: Minimum Energy Performanceposted by sherif el adly on Nov 29, 2016, 10:11 am
the building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice storage +... |
|
Concrete as Temp barriersNC-2009 MRc2: Construction Waste Managementposted by Ahmad Gabir on Nov 29, 2016, 8:44 am
Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of... Last reply: Saud Abdul Rasheed, Nov 29, 2016, 9:05 am |
|
water cooled chillersNC-2009 EAp2: Minimum Energy Performanceposted by sherif el adly on Oct 23, 2016, 3:50 pm
Hi Marcus, Last reply: Marcus Sheffer, Oct 23, 2016, 3:51 pm |
|
EAp2NC-2009 EAp2: Minimum Energy Performanceposted by sherif el adly on Aug 9, 2016, 4:18 pm
We are working on a huge project in Riyadh, to meet EAp2 we sould look for a water cooled chiller due to the area of the project and the challenge to reach a COP near to 8 to meet the 10% from... Last reply: Marcus Sheffer, Aug 16, 2016, 11:55 am |
|
CxA roleNC-2009 EAc3: Enhanced Commissioningposted by Abdulla Anwar on Aug 8, 2016, 6:17 am
Can you advise the... Last reply: Scott Bowman, Aug 9, 2016, 11:27 am |
|
Infill SiteND-Plan-v4 SLLp1: Smart locationposted by Jos Schild on Jul 18, 2016, 8:08 am
Is there a definition of an '... Last reply: Eliot Allen, Jul 18, 2016, 11:36 am |
|
SRI of sandNC-2009 SSc7.1: Heat island effect - nonroofposted by Karim Farah on Sep 23, 2014, 2:10 am
Does anybody know the... Last reply: RETIRED, May 25, 2016, 1:36 pm |