Anticipated Project TypeLEED Rating System Selectionposted by Barbara Beckmann on May 24, 2022, 10:40 am
On the process of registration, in step 4 - Project Information on Anticipated Project Type there isn't a category that clearly represents the building we are working. This is a building with an... |
|
Does the project scope for kitchen appliances include future tenants?NC-v4 WEp2: Indoor water use reductionposted by Christoph Keck on Apr 25, 2022, 7:47 am
Hi guys, we are currently in the pre-certification stage of a hotel + retail complex. This complex will host 6 restaurants / fast food joints which will all be leased and one restaurant... Last reply: emily reese moody, May 13, 2022, 6:58 pm |
|
exemptions for the location of the permanent entryways systemsNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Alexandre DENEUVILLE on Apr 20, 2022, 11:49 am
Hello, Can you confirm that the presence of entryway systems can be dispense in the entrances where the traffic of trolley is frequent? Thank you Last reply: emily reese moody, May 13, 2022, 6:34 pm |
|
Softwares respecting the Ashrae regulationNC-v4.1 EAp2: Minimum Energy Performanceposted by Sam Tognet on Apr 29, 2022, 5:31 am
Hello everyone, In France, and at the company I am at we use: Pleiades as a software for Thermal dynamic simulation, but it turns out that this software doesn't respect ASHRAE Regulation,... Last reply: Sam Tognet, May 2, 2022, 1:34 pm |
|
Calculating daily average and peak total occupantsCalculating FTEsposted by Nicole Isk on Oct 4, 2019, 11:24 am
Hi, i have a question regarding the calculation of the daily average and peak total occupants, because we received a review commnt on this topic. I have no idea how to calculate it and i... Last reply: Michelle Halle Stern, Apr 21, 2022, 2:25 pm |
|
LEED v4.1 Renewable Energy- no contracts with a period longer than two years availableNC-v4.1 EAc5: Renewable energyposted by J Schütz on Apr 2, 2020, 10:30 am
Dear all, Actually, German law prohibits electricity contracts with a fixed contract period longer than two years, there has to be the possibility to cancel the contract. Although, the... Last reply: Hashir Usman, Mar 30, 2022, 7:44 am |
|
Comparison between the three systems BREEAM, DNGB LEEDLEED Rating System Selectionposted by Wisam Maddni on Mar 9, 2022, 4:03 am
Dear ladies and gentlemen, I would like to ask this question: Are there currently properties that have several certification systems (... |
|
Existing Building with DES: choosing v4/v4.1, DES modelling strategyCS-v4 EAc2: Optimize Energy Performanceposted by Sarah Leenknegt on Jan 31, 2022, 11:18 am
Hi everyone We are trying to make some strategic decisions and would be happy about some feedback. First a short summary, two questions are below. Situation is an existing office... Last reply: Tyler Thumma, Mar 8, 2022, 8:44 am |
|
Legal division of a building and option for certificationLEED Guidance for Campuses and Multiple Buildingsposted by Daniel Villar San Juan on Mar 2, 2022, 3:03 am
Dear all, we have a change of ownership in our already pre-certified LEED v4 BD+C Core&Shell project. |
|
Thermal comfort using thermal dynamic simulationNC-v4 EQc5: Thermal comfortposted by Eduardo Vidal Kume on Mar 1, 2022, 8:47 am
Hi! Does anyone have experience with LEED Credit EQc5 Thermal Comfort using thermal simulation? We know that all occupied rooms should comply to it but is not clear to us if we should... |