Topic | Recent |
---|---|
DOAS with 2 energy wheelNC-v4 EAp2: Minimum Energy Performanceposted by Mohamed Shehata on Apr 18, 2023, 3:31 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5916 thumbs up April 21, 2023- 7:11 pm This question is very software specific and is more appropriate for the software developer than for a LEED forum. Perhaps you want to restate it? Log in or register to post comments ... Last reply: Marcus Sheffer, Apr 21, 2023, 7:11 pm |
|
Waste ScoreEBOM-v4.1 MRp3: Waste Performanceposted by Maysoon Al-Khuraissat on Apr 7, 2023, 3:59 am
Is there a reference or a list showing the waste score for the baseline buildings? Can a project predict what percentage of... |
|
Outdoor Water Use credit- LEED V4.1NC-v4.1 WEc1: Outdoor water use reductionposted by Maria Farah on Mar 17, 2023, 12:57 pm
In LEED BD+C: New Construction V4.1, the outdoor water use reduction credit (2 points) states that alternative water sources can be used to achieve an additional 30% reduction. However, unlike in... |
|
LEED O+M Campus Chiller PlantEBOM-v4.1 EAp3: Energy Performanceposted by Rajarajan Sekar on Mar 11, 2023, 1:47 am
We are trying to go for LEED O+M certification in one of our buildings which has a Chiller plant in it along with other occupied places Since we are measuring the building energy... |
|
Data Sheet or Laboratory test report?NC-v4 SSc5: Heat Island Reductionposted by Samer Alhmdan on Jul 20, 2017, 8:46 am
Hello, Do we need a laboratory test report to substantiate the... Last reply: emily reese moody, Feb 9, 2023, 1:17 am |
|
LED Wall washer calculationLEED v4.1 Discussion Forumposted by Martina Vázquez on Feb 1, 2023, 6:35 am
Good morning, I've been studing LEED v4.1 document and it is almost all of it for streetlight projects, but we have a proposal based in wall-washer the exterior facade. I don't really know... |
|
System 2 as the baseline system for the whole projectNC-v4 EAp2: Minimum Energy Performanceposted by Amal Venugopal on Jan 21, 2023, 8:29 pm
We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. Greetings!... We have a question regarding the... Last reply: Marcus Sheffer, Jan 27, 2023, 2:01 pm |
|
Resort: Baseline HVACNC-v4 EAc2: Optimize Energy Performanceposted by Amal Venugopal on Jan 23, 2023, 3:07 am
Greetings!... We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. We have a question... Last reply: Marcus Sheffer, Jan 27, 2023, 2:00 pm |
|
Commingled Waste approach in storage locations for recyclable materialsEBOM-v4.1 MRp3: Waste Performanceposted by Maysoon Al-Khuraissat on Sep 20, 2022, 9:59 am
I'm working on a huge existing Mall, Is the... |
|
PV Solar Panels outside LEED BoundaryNC-2009 EAc2: On-Site Renewable Energyposted by Ammar Yahia on Aug 25, 2022, 3:56 am
A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project" to offset 22% of annual energy cost. Is it possible to... Last reply: Marcus Sheffer, Aug 25, 2022, 8:50 am |