Forum » South America
Topic

Building Footprint in mixed used building

NC-2009 PIf2: Project Summary Details
posted by Victoria Rios Esteve on May 17, 2021, 3:47 am

Hi everyone, 

We are working on one building that has 2 different programmes. But, only one is going under LEED certification. That means that in GF both programmes appear, but with clear...

Last reply: Deborah Lucking, May 17, 2021, 11:37 pm

Credit Application EB:O+M

Pilot-Credits SSpc82: Local food production
posted by Marina Andrade on May 17, 2021, 1:55 pm

We are in a preliminary review of an EB: O + M project, persuading the Local Food production credit. As a first alternative, the building included the minimum area required by the credit. However...

Soils in green roofs

NC-v4.1 SSc2: Protect or Restore Habitat
posted by Alexia Anastassiadis on May 17, 2021, 9:52 am

Hi! Our project has a...

Solar Panels

NC-2009 EAc2: On-Site Renewable Energy
posted by Paula Hernandez on Jan 9, 2017, 8:35 am

Hello,
I am working on a Project that wants to claim all the available points on EA-c2. But they don´t have the space needed to place all the solar panels inside the LEED boundary.
...

Last reply: Marcus Sheffer, Feb 16, 2021, 5:09 pm

Naturally Ventilated Warehouse

CS-v4 EQp1: Minimum indoor air quality performance
posted by Micaela Smulevich on Jan 28, 2021, 3:38 pm

We are currently working on incorporating sufficient strategies to naturally ventilate an industrial warehouse. Due to the dimensions of the warehouse it is not possible to consider all surface...

Last reply: Andrew Mitchell, P.E., Jan 28, 2021, 4:33 pm

Need more info on v4.1 Integrative Process credit

NC-v4.1 IPc1: Integrative process
posted by Victoria Rios Esteve on Jan 7, 2021, 11:16 am

Hi everyone! We are working on the certificacion of a major renovation building. We are willing to get this IP credit but have some doubts. 1) What are the differences between v4 and v4.1 version...

Last reply: Marcus Sheffer, Jan 8, 2021, 1:21 pm

Owner's Representative Sign

NC-v4 EAp3: Building-level energy metering
posted by Sofia Barahona on Dec 14, 2020, 9:42 am

Does the commitment letter be signed by the owner, which appears on the Project Details registered on LEEDOnline? We have a project which all the the decitions and policies are taken by a...

Last reply: Sofia Barahona, Dec 14, 2020, 12:52 pm

CREDITO LIGHT POLLUTION REDUCTION

EBOM-v4.1 SSc3: Light Pollution Reduction
posted by Megan Cecilia Vizcarra on Dec 10, 2020, 8:13 am

Buenos dias, una consulta. En cuanto a la toma de mediciones de iluminación exterior en un edificio. ¿A que nivel de referencia se deben hacer estas mediciones? (en este caso usaremos luxometro...

Aerator with no WaterSense label

NC-v4 WEp2: Indoor water use reduction
posted by Victoria Rios Esteve on May 18, 2020, 3:48 pm

Hi everyone, 

We are having a problem with the requirements of WEp2. For a public faucet, LEEDs baseline for flow rate is 1.9 lpm. Here, in Argentina, the lowest flow rate faucet available...

Last reply: Sara BENLOUBA, Nov 24, 2020, 9:54 am

EAc6 Enhanced Refrigerant Management

NC-v4 EAc6: Enhanced Refrigerant Management
posted by Roshni Lad on Sep 18, 2020, 3:06 pm

Hello,

I am working on a New Construction project - a community center, certifying under LEED v4. 

I am pretty new with LEED projects and trying to identify whether the HVAC systems...

Last reply: Daniel Davis, Nov 10, 2020, 4:58 pm