Building Footprint in mixed used buildingNC-2009 PIf2: Project Summary Detailsposted by Victoria Rios Esteve on May 17, 2021, 3:47 am
Hi everyone, We are working on one building that has 2 different programmes. But, only one is going under LEED certification. That means that in GF both programmes appear, but with clear... Last reply: Deborah Lucking, May 17, 2021, 11:37 pm |
|
Credit Application EB:O+MPilot-Credits SSpc82: Local food productionposted by Marina Andrade on May 17, 2021, 1:55 pm
We are in a preliminary review of an EB: O + M project, persuading the Local Food production credit. As a first alternative, the building included the minimum area required by the credit. However... |
|
Soils in green roofsNC-v4.1 SSc2: Protect or Restore Habitatposted by Alexia Anastassiadis on May 17, 2021, 9:52 am
Hi! Our project has a... |
|
Solar PanelsNC-2009 EAc2: On-Site Renewable Energyposted by Paula Hernandez on Jan 9, 2017, 8:35 am
Hello, Last reply: Marcus Sheffer, Feb 16, 2021, 5:09 pm |
|
Naturally Ventilated WarehouseCS-v4 EQp1: Minimum indoor air quality performanceposted by Micaela Smulevich on Jan 28, 2021, 3:38 pm
We are currently working on incorporating sufficient strategies to naturally ventilate an industrial warehouse. Due to the dimensions of the warehouse it is not possible to consider all surface... Last reply: Andrew Mitchell, P.E., Jan 28, 2021, 4:33 pm |
|
Need more info on v4.1 Integrative Process creditNC-v4.1 IPc1: Integrative processposted by Victoria Rios Esteve on Jan 7, 2021, 11:16 am
Hi everyone! We are working on the certificacion of a major renovation building. We are willing to get this IP credit but have some doubts. 1) What are the differences between v4 and v4.1 version... Last reply: Marcus Sheffer, Jan 8, 2021, 1:21 pm |
|
Owner's Representative SignNC-v4 EAp3: Building-level energy meteringposted by Sofia Barahona on Dec 14, 2020, 9:42 am
Does the commitment letter be signed by the owner, which appears on the Project Details registered on LEEDOnline? We have a project which all the the decitions and policies are taken by a... Last reply: Sofia Barahona, Dec 14, 2020, 12:52 pm |
|
CREDITO LIGHT POLLUTION REDUCTIONEBOM-v4.1 SSc3: Light Pollution Reductionposted by Megan Cecilia Vizcarra on Dec 10, 2020, 8:13 am
Buenos dias, una consulta. En cuanto a la toma de mediciones de iluminación exterior en un edificio. ¿A que nivel de referencia se deben hacer estas mediciones? (en este caso usaremos luxometro... |
|
Aerator with no WaterSense labelNC-v4 WEp2: Indoor water use reductionposted by Victoria Rios Esteve on May 18, 2020, 3:48 pm
Hi everyone, We are having a problem with the requirements of WEp2. For a public faucet, LEEDs baseline for flow rate is 1.9 lpm. Here, in Argentina, the lowest flow rate faucet available... Last reply: Sara BENLOUBA, Nov 24, 2020, 9:54 am |
|
EAc6 Enhanced Refrigerant ManagementNC-v4 EAc6: Enhanced Refrigerant Managementposted by Roshni Lad on Sep 18, 2020, 3:06 pm
Hello, I am working on a New Construction project - a community center, certifying under LEED v4. I am pretty new with LEED projects and trying to identify whether the HVAC systems... Last reply: Daniel Davis, Nov 10, 2020, 4:58 pm |