Log in
Forum » Asia – South and Southeast
Topic

Basement Ventilation exceptional calculations

NC-2009 EAp2: Minimum Energy Performance
posted by Rathnashree Bharadwaj on Nov 20, 2014, 2:28 am

Our project has 4 basements with fresh air, exhaust and circulation fans. The logic of exhaust fan functioning is designed such that during normal mode only few fans operate, during pollution...

Last reply: Marcus Sheffer, Nov 21, 2014, 9:47 am

Does all of Section 1.6 results have to be filled?

NC-2009 EAp2: Minimum Energy Performance
posted by Ivan Priatman on Nov 19, 2014, 8:20 pm

Dear LEED,
We are trying to achieve points in EAp2 scorecard via Building Simulation Method. Since this is our first experience in using LEED, we only filled the information about Interior...

Last reply: Marcus Sheffer, Nov 20, 2014, 10:05 am

Alternative HVAC duct sealant

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by John Covello on Nov 18, 2014, 3:06 am

Hi,

My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight. Their concern is the...

Last reply: Michelle Halle Stern, Nov 19, 2014, 1:19 pm

loading bay inside building footprint

NC-2009 PIf2: Project Summary Details
posted by Melissa Merryweather on Nov 13, 2014, 1:04 am

Hi, I have a garment factory and the loading...

MIXED MODE Ventilation

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Sathish Kumar on Nov 11, 2014, 1:08 am

May i know, what are the documents are providing clarity on designing the mixed mode ventilation strategies?

Selection of HVAC Baseline System

NC-2009 EAp2: Minimum Energy Performance
posted by Praveenbabu Rajkumar on Oct 23, 2014, 6:26 am

Hi,

Sorry for my English

Any one can suggest, which is correct baseline HVAC system for following project description.

No. of Floors: 7 - including terrace floor (B+G+4+...

Last reply: Marcus Sheffer, Nov 2, 2014, 6:29 pm

link goes to the main USGBC home page

Pilot-Credits PC14: Walkable Streets
posted by Melissa Merryweather on Oct 28, 2014, 11:00 pm

Hi, I am registered for this Pilot Credit. However, when I went to register my user-name for this credit using your link at the top of this page (step 2) I get a message saying I don't have...

Green Cleaning

NC-2009 IDc1: Innovation in Design
posted by Stella Stella on Oct 15, 2014, 2:44 am

Hi,
We are trying to document...

Last reply: Nelina Loiselle, Oct 15, 2014, 11:26 am

Long Term Service Contract

NC-2009 EAc4: Enhanced Refrigerant Management
posted by Erin Holdenried on Oct 13, 2014, 1:40 pm

Does anybody have an example of a long term service contract, or know specifically what needs to be included in the contract in order for it to be accepted by the...

Modeling pump, fan, COP

CS-2009 EAp2: Minimum Energy Performance
posted by Indochine Engineering VN on Oct 6, 2014, 11:20 pm

Hi, I have many chilled water pumps, 1 primary and 3 loop secondary pumps with heat exchangers. The issue is the modelling software - HAP (even IES) can model only 1 primary and 1 secondary pump...

Last reply: Marcus Sheffer, Oct 7, 2014, 9:20 am