Topic | Recent |
---|---|
Basement Ventilation exceptional calculationsNC-2009 EAp2: Minimum Energy Performanceposted by Rathnashree Bharadwaj on Nov 20, 2014, 2:28 am
Our project has 4 basements with fresh air, exhaust and circulation fans. The logic of exhaust fan functioning is designed such that during normal mode only few fans operate, during pollution... Last reply: Marcus Sheffer, Nov 21, 2014, 9:47 am |
|
Does all of Section 1.6 results have to be filled?NC-2009 EAp2: Minimum Energy Performanceposted by Ivan Priatman on Nov 19, 2014, 8:20 pm
Dear LEED, Last reply: Marcus Sheffer, Nov 20, 2014, 10:05 am |
|
Alternative HVAC duct sealantNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by John Covello on Nov 18, 2014, 3:06 am
Hi, My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight. Their concern is the... Last reply: Michelle Halle Stern, Nov 19, 2014, 1:19 pm |
|
loading bay inside building footprintNC-2009 PIf2: Project Summary Detailsposted by Melissa Merryweather on Nov 13, 2014, 1:04 am
Hi, I have a garment factory and the loading... |
|
MIXED MODE VentilationCI-2009 IEQp1: Minimum indoor air quality performanceposted by Sathish Kumar on Nov 11, 2014, 1:08 am
May i know, what are the documents are providing clarity on designing the mixed mode ventilation strategies? |
|
Selection of HVAC Baseline SystemNC-2009 EAp2: Minimum Energy Performanceposted by Praveenbabu Rajkumar on Oct 23, 2014, 6:26 am
Hi, Sorry for my English Any one can suggest, which is correct baseline HVAC system for following project description. No. of Floors: 7 - including terrace floor (B+G+4+... Last reply: Marcus Sheffer, Nov 2, 2014, 6:29 pm |
|
link goes to the main USGBC home pagePilot-Credits PC14: Walkable Streetsposted by Melissa Merryweather on Oct 28, 2014, 11:00 pm
Hi, I am registered for this Pilot Credit. However, when I went to register my user-name for this credit using your link at the top of this page (step 2) I get a message saying I don't have... |
|
Green CleaningNC-2009 IDc1: Innovation in Designposted by Stella Stella on Oct 15, 2014, 2:44 am
Hi, Last reply: Nelina Loiselle, Oct 15, 2014, 11:26 am |
|
Long Term Service ContractNC-2009 EAc4: Enhanced Refrigerant Managementposted by Erin Holdenried on Oct 13, 2014, 1:40 pm
Does anybody have an example of a long term service contract, or know specifically what needs to be included in the contract in order for it to be accepted by the... |
|
Modeling pump, fan, COPCS-2009 EAp2: Minimum Energy Performanceposted by Indochine Engineering VN on Oct 6, 2014, 11:20 pm
Hi, I have many chilled water pumps, 1 primary and 3 loop secondary pumps with heat exchangers. The issue is the modelling software - HAP (even IES) can model only 1 primary and 1 secondary pump... Last reply: Marcus Sheffer, Oct 7, 2014, 9:20 am |