Modeling semi heated space in baseline caseNC-2009 EAc1: Optimize Energy Performanceposted by Gopinath Vasu on Jan 21, 2016, 11:47 am
Hi All, I am working on a project with warehouse space which is heated and ventilated with heating capacity greater than 3.5... Last reply: Gopinath Vasu, Jan 23, 2016, 11:52 pm |
|
Energy Performance: Automated Lightning and HVAC systemNC-2009 EAc1: Optimize Energy Performanceposted by Marco Valerio Ceccotti on Dec 15, 2015, 11:52 am
We Desined a Dormitory Building ( NC ) already constructed and in operation. Last reply: Marco Valerio Ceccotti, Dec 18, 2015, 1:14 pm |
|
Exterior lighting- Baseline BuildingNC-2009 EAc1: Optimize Energy Performanceposted by VICTOR MORENO on Dec 18, 2015, 10:33 am
To simulate the exterior lighting in Baseline Building, i have to model it according table 9.4.5 of Standard 90.1? Or it is not possible to earn points for exterior lighting systems? ...Last reply: Marcus Sheffer, Dec 18, 2015, 10:45 am |
|
Baseline HVAC SystemNC-2009 EAc1: Optimize Energy Performanceposted by Ciaran McCabe on Dec 10, 2015, 11:18 am
Hi, When determining the most suitable Baseline HVAC System to use, as this is a function of building area and number of floors. Would you count a basement car park as a "floor". My... Last reply: Marcus Sheffer, Dec 10, 2015, 7:02 pm |
|
Help modeling heating only buildingNC-2009 EAc1: Optimize Energy Performanceposted by Logan Dorrell on Nov 6, 2015, 12:01 pm
We are modeling a building in EnergyPro that is heating only, with radiant heating panels and ventilation thru DOAS. We received a LEED review comment stating: "If the heating output... Last reply: Marcus Sheffer, Nov 6, 2015, 2:58 pm |
|
LEED 2009 Energy UpdatesNC-2009 EAc1: Optimize Energy Performanceposted by Theresa Lehman on Sep 30, 2015, 5:23 pm
Did anyone see the that USGBC has launched a set of proposals to increase the energy minimums for LEED v2009, which is open for project registration until October 31, 2016. Please visit:... Last reply: Scott Bowman, Oct 19, 2015, 3:35 pm |
|
Ventilated Only Space SimulationNC-2009 EAc1: Optimize Energy Performanceposted by TOMAS URIBE on May 6, 2014, 1:42 pm
Hello Marcus! In the HVAC design of a project, there is a space where supply ventilation is included in order to accomplish the minimum amount of air required by ASHRAE 62.1-2007 standard... Last reply: Marcus Sheffer, Oct 2, 2015, 4:16 pm |
|
Rounding of Percent Energy Cost Savings for EAc1 PointsNC-2009 EAc1: Optimize Energy Performanceposted by Joseph Chappell on Aug 13, 2015, 2:53 pm
Hi all, We recently received a final design review where our percent energy cost savings have been corrected by the reviewer to show 31.95%. This project is an existing building... Last reply: Christopher Schaffner, Sep 14, 2015, 10:04 am |
|
DES Option 2 when project contains the DESNC-2009 EAc1: Optimize Energy Performanceposted by Stephanie Graham on Sep 9, 2015, 5:34 pm
Project is LEED-NC v2009 project in which a building contains a... Last reply: Marcus Sheffer, Sep 10, 2015, 11:35 am |
|
Group Certification NC V3 EAc1NC-2009 EAc1: Optimize Energy Performanceposted by Neil Rosen on Sep 9, 2015, 1:19 pm
I am working on a project that consists of 2 buildings on one site that I plan on certifying using the Group Certification option discussed in the LEED Campus Guidance document. In... Last reply: Marcus Sheffer, Sep 9, 2015, 2:15 pm |