Topic | Recent |
---|---|
Walkable Streets- HistoricPilot-Credits PC14: Walkable Streetsposted by Pat Thomas on Mar 22, 2012, 12:56 pm
Our project is an adaptive... Last reply: Nicholas Harrell, Mar 23, 2012, 4:21 pm |
|
Upcoming Pilot Credit WebinarPilot-Credits PC14: Walkable Streetsposted by Chris Marshall on Jan 5, 2012, 12:55 pm
USGBC will be hosting a webinar on location- and transportation-related pilot credits on Thursday, March 22, 1:00 - 2:30... |
|
What is the correct way to find the width of the street?Pilot-Credits PC14: Walkable Streetsposted by Grace Heicher on Apr 4, 2011, 12:00 pm
The credit requirements do not seem to be consistent in defining the street width. First they require a minimum building-height-to-street width ratio of 1:3, "measured to the centerline of the... Last reply: Maria Porter, Dec 19, 2011, 7:11 am |
|
Main Entry facing a PlazaPilot-Credits PC14: Walkable Streetsposted by Roshini Das on Dec 6, 2011, 1:21 pm
Our project is a dormitory for 1-8 grade kids located in a campus. The main entry faces a plaza, second entry faces a parking cul-de-sac (entry faces the street with parking inside the cul-de-sac... |
|
Cumulative Facade Intrusion?Pilot-Credits PC14: Walkable Streetsposted by Kimberly Frith on Sep 16, 2011, 3:36 pm
Our project has two facades extending along sidewalks. Going by the credit requirements, we cannot have more than fifty feet of blank facade. One of the facades has 54 feet of blank length, while... Last reply: Chris Marshall, Nov 15, 2011, 12:38 pm |
|
Sidewalk definitionPilot-Credits PC14: Walkable Streetsposted by Jens Apel on Aug 10, 2011, 7:34 am
How would the sidewalk length for the category "Sidewalk Intrusions" be measured for a project consisting of several buildings on a plaza. Last reply: Chris Marshall, Aug 12, 2011, 12:54 pm |
|
Entrance lobby as live-work spacePilot-Credits PC14: Walkable Streetsposted by Jens Apel on Aug 10, 2011, 7:30 am
In my project there is a main entrance lobby that includes a permanently manned reception. Would that count as live-work space for category "Ground-Level Use and Parking" option h? Last reply: Chris Marshall, Aug 11, 2011, 2:29 pm |
|
Estimated crown diameterPilot-Credits PC14: Walkable Streetsposted by Christina Lynch on Mar 22, 2011, 9:13 am
Does anyone have a good resource for or way of calculating a tree's estimated crown diameter? (Benchmark "m" for NC/CS or "f" for Schools). Thanks! Last reply: Chris Marshall, May 5, 2011, 3:44 pm |
|
MapsPilot-Credits PC14: Walkable Streetsposted by Jacki Craig on Apr 12, 2011, 6:17 pm
The credit asks for multiple types of map to show different site requirements. Is it acceptable to include all necessary info on one map, or do they have to be broken down like they are under the... Last reply: Chris Marshall, Apr 13, 2011, 4:28 pm |
|
On-Street ParkingPilot-Credits PC14: Walkable Streetsposted by Carly Ruggieri on Apr 12, 2011, 11:11 am
Can projects use on-street parking that has time limitations (e.g. Parking is prohibited from 8am-6pm on Weekdays)? Since parking is technically allowed, just not at all times, can this still... Last reply: Chris Marshall, Apr 13, 2011, 4:21 pm |