2-year contract from what time?NC-2009 EAc6: Green Powerposted by Maria Porter on Nov 2, 2017, 7:31 am
I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case? I have one project that wants to wait for about 3-6 months for all... Last reply: Kristina Bach, Nov 2, 2017, 8:39 am |
|
Managing rainwater in clay soil with low permeabilityCS-v4 SSc4: Rainwater managementposted by Maria Glädt on Aug 17, 2016, 9:26 am
Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay). There is... Last reply: Michael DeVuono, Oct 24, 2017, 10:12 am |
|
Pilot credit wakable siteCS-v4 INc1: Innovationposted by Tobias Berge on Sep 7, 2017, 4:53 am
We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit... Last reply: Tristan Roberts, Sep 9, 2017, 3:04 am |
|
Increased ventilation instead of alarms?NC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Maria Porter on Aug 23, 2017, 3:11 am
I understand that for densely occupied spaces an alarm (visible or audible) is required. If a sensor was installed in the room, but instead of beeping/flashing it would increase the ventilation... Last reply: Andrew Mitchell, P.E., Aug 30, 2017, 8:54 pm |
|
Renewable EnergyCI-v4 EAc4: Renewable energy productionposted by Maria Glädt on Dec 17, 2014, 2:05 pm
See quotation from LEED-CI. "Use tenant... Last reply: Marcus Sheffer, Aug 28, 2017, 10:22 am |
|
Renewable Energy in CS projectCI-v4 EAc4: Renewable energy productionposted by Sara Johansson on Mar 29, 2017, 9:36 am
Is the tenant obliged to install additional... Last reply: Marcus Sheffer, Aug 28, 2017, 10:17 am |
|
PPA as renewable energy production?CS-v4 EAc5: Renewable energy productionposted by Lai-San wong on Jun 12, 2017, 9:38 am
Hi! In the requirement for EAc5 (BD+C) it is stated: Last reply: Marcus Sheffer, Aug 28, 2017, 9:41 am |
|
Bicycle Storage for residential part in mixed used buildingCS-v4 LTc6: Bicycle facilitiesposted by Malti Gupta on Jul 26, 2017, 2:15 am
I'm working on mixed used LEED CS v4 project. we have Offices, retail & residential areas. To calculate bicycle storage & shower for offices & retails we considered the default... Last reply: Tristan Roberts, Aug 26, 2017, 1:16 pm |
|
Peak building users (FTE + Peak Transients)CS-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Sara Johansson on Jun 20, 2017, 4:57 am
I am working on a LEED v.2009 CS project, using deafault occupancy Core and Shell Appendix 1. I assume that... Last reply: Sara Johansson, Jun 20, 2017, 6:25 am |
|
Changing FacilitiesCS-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Sara Johansson on Jun 20, 2017, 4:34 am
I am working on a LEED CS v.2009 project greater than 300 000 sf. Last reply: Charles Nepps, Jun 20, 2017, 5:15 am |