Exterior lighting powerNC-v4 EAp2: Minimum Energy Performanceposted by Julien Richard on Sep 8, 2016, 10:08 am
Hello, We have a project where some luminaires have more power than what it is required by the mandatory provisions of exterior lighting power. Last reply: Julien Richard, Sep 13, 2016, 5:31 am |
|
Actual Occupancy: LEED Online ForumCS-2009 PIf3: Occupant and Usage Dataposted by Ian McCall on May 11, 2015, 5:06 am
Hello, Last reply: Summer Minchew, Jul 19, 2016, 9:48 am |
|
What if the Database of LCA tools is incomplete?NC-v4 MRc1: Building life-cycle impact reductionposted by Marius Dabonneville on Mar 29, 2016, 5:16 am
Hello, I’m Marius, I’m an intern in an environmental office in France. I’m working on Materials and that’s why I have a few questions about this credit and particularly Option 4. Last reply: elsa neves, Jun 19, 2016, 2:44 pm |
|
C&S or NC?LEED Rating System Selectionposted by Claire PIMET on Jun 10, 2016, 10:44 am
I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project. The project is an existing building and the major refurbishment... |
|
Anti corrosion paint under fire retardingNC-v4 EQc2: Low-emitting materialsposted by Elodie DUMAS on May 9, 2016, 9:56 am
Our contractor must spread an anti corrosion paint under a fire retarding flocking (on a metallic... Last reply: Michelle Halle Stern, May 9, 2016, 1:24 pm |
|
Sea water exchanger heat pump, considere as renewable energy?NC-2009 EAc2: On-Site Renewable Energyposted by Elodie DUMAS on Jan 29, 2016, 4:55 am
Hello Last reply: Matthew Kozlowski, May 5, 2016, 11:14 am |
|
Fertilizer and Herbicide UseEBOM-v4 SSp1: Site management policyposted by David ESPAGNET on May 2, 2016, 5:55 am
In the site Management Policy (and SSc5 Credit) soil testing requirement have been added since 2009. Do we need to test soil (and retest every other year) to establish soil type if no Fertilizer... |
|
Construction Waste Management-Multiple BuildingsNC-2009 MRc2: Construction Waste Managementposted by Ian McCall on May 12, 2015, 10:12 am
Dear LEED-ers, Scenario : One single project, consisting of an office building (LEED Ceritified) & hotel building (NOT LEED Certified) in a very built up area with limited space. Both... Last reply: Melissa Merryweather, Apr 10, 2016, 8:25 pm |
|
LEED CS 2009 Update from october 2010LEED Rating System Selectionposted by Valentin Grimaud on Feb 9, 2016, 9:48 am
I am currently looking for a PDF version of LEED rating system CS 2009 updated from october 2010. Current version on USGBC website is updated from 2013, but the project I'm currently... Last reply: Tristan Roberts, Apr 10, 2016, 8:07 am |
|
Erosion and Sedimentation Measures during demolitionNC-v4 SSp1: Construction Activity Pollution Preventionposted by Anaïs P on Feb 9, 2016, 10:49 am
During demolition works, should the Erosion and Sedimentation measures be implemented? Last reply: Tristan Roberts, Feb 22, 2016, 12:21 pm |