Log in
Forum » Saudi Arabia
Topic

Mosquitos eradicate substance

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Tota Yun on Oct 31, 2016, 3:23 am

How I can know if this substance which already used by the contractor in new construction project comply with LEED
DELTABAZ 25 EC

Last reply: Tota Yun, Jan 9, 2017, 12:11 am

Inspection Reports- responsible party

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by komal kotwal on Sep 1, 2016, 11:28 am

Is it required that the on-site inspection be conducted by a third party or can a Contractor's representative conduct the same?

Last reply: James Wilson, Jan 8, 2017, 12:22 pm

green power source

NC-2009 EAc6: Green Power
posted by sherif el adly on Dec 1, 2016, 12:34 pm

The client have a solar park in a land adjacent to the land on which the project will be built. The client has the ability to increase the LEED boundary and add the two lands such that this solar...

Last reply: Marcus Sheffer, Dec 1, 2016, 2:10 pm

water cooled chilller

NC-2009 EAp2: Minimum Energy Performance
posted by sherif el adly on Dec 1, 2016, 11:53 am

Hi Marcus

The building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller...

Last reply: Marcus Sheffer, Dec 1, 2016, 12:40 pm

modeling with air cooled chiller

NC-2009 EAp2: Minimum Energy Performance
posted by sherif el adly on Nov 29, 2016, 10:11 am

the building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice storage +...

Concrete as Temp barriers

NC-2009 MRc2: Construction Waste Management
posted by Ahmad Gabir on Nov 29, 2016, 8:44 am

Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of...

Last reply: Saud Abdul Rasheed, Nov 29, 2016, 9:05 am

water cooled chillers

NC-2009 EAp2: Minimum Energy Performance
posted by sherif el adly on Oct 23, 2016, 3:50 pm

Hi Marcus,
I am working on a project in KSA of about 404330ft2.
According to that area and with reference to ASHREA appendix G, a water cooled chiller should be considered in baseline...

Last reply: Marcus Sheffer, Oct 23, 2016, 3:51 pm

EAp2

NC-2009 EAp2: Minimum Energy Performance
posted by sherif el adly on Aug 9, 2016, 4:18 pm

We are working on a huge project in Riyadh, to meet EAp2 we sould look for a water cooled chiller due to the area of the project and the challenge to reach a COP near to 8 to meet the 10% from...

Last reply: Marcus Sheffer, Aug 16, 2016, 11:55 am

CxA role

NC-2009 EAc3: Enhanced Commissioning
posted by Abdulla Anwar on Aug 8, 2016, 6:17 am

Can you advise the...

Last reply: Scott Bowman, Aug 9, 2016, 11:27 am

Infill Site

ND-Plan-v4 SLLp1: Smart location
posted by Jos Schild on Jul 18, 2016, 8:08 am

Is there a definition of an '...

Last reply: Eliot Allen, Jul 18, 2016, 11:36 am