Exterior lighting for group certificationNC-2009 SSc8: Light Pollution Reductionposted by Mohamed M. Abd Elhameed on Mar 27, 2017, 6:19 pm
I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance. Up to my understanding exterior... Last reply: Bill Swanson, Jun 12, 2017, 11:13 am |
|
Estimating the energy cost share of PVNC-2009 EAc2: On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on Jun 6, 2017, 4:45 am
I am working on an industrial LEED project in KSA. Most of electrical loads are for the industrial processes itself (i.e production line), while the other remaining loads are for HVAC and... Last reply: Marcus Sheffer, Jun 6, 2017, 11:58 am |
|
Estimating the energy cost share of PVNC-2009 EAc2: On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on Jun 6, 2017, 4:46 am
I am working on an industrial LEED project in KSA. Most of electrical loads are for the industrial processes itself (i.e production line), while the other remaining loads are for HVAC and... |
|
Baseline System 2NC-2009 EAc1: Optimize Energy Performanceposted by SSN Energy Model on Apr 16, 2017, 2:02 am
As per Table 6.8.1D, I observed the following Last reply: Marcus Sheffer, Apr 21, 2017, 10:48 am |
|
Baseline EER- System 2 PTHPNC-2009 EAp2: Minimum Energy Performanceposted by SSN Energy Model on Apr 13, 2017, 6:32 am
As per Table 6.8.1D, I observed the following EER = 12.3-(0.213*Cap/1000) EER Also, Cap means the rated cooling capacity of the product in... Last reply: Marcus Sheffer, Apr 21, 2017, 10:41 am |
|
aerosol paintsNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Abdulla Anwar on Mar 1, 2017, 9:00 am
is there any requirements for aerosol paints? which might be used by construction team for marking junction boxes purposes (inside weatherproof). the question is there any criteria... Last reply: Debra a. Lombard, Apr 19, 2017, 12:35 pm |
|
System 2- LEED Fan Power ASHRAE 90.1.2007NC-2009 EAp2: Minimum Energy Performanceposted by SSN Energy Model on Apr 13, 2017, 2:07 am
Hi, Greetings! I am doing Energy Model for Labor Accommodation. I have some doubts and need your help, Baseline system will be system 2 as per ASHRAE 90.1.2007. Since, the... Last reply: Marcus Sheffer, Apr 13, 2017, 12:10 pm |
|
smoke leakage test for ductNC-2009 EAc3: Enhanced Commissioningposted by Abdulla Anwar on Feb 23, 2017, 9:10 am
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test? prior to air leakage test since the project specs is giving a small allowable 1% from... Last reply: Scott Bowman, Feb 27, 2017, 4:11 pm |
|
Proposed case cooling capacity reducing energy savingsNC-2009 EAc1: Optimize Energy Performanceposted by SSN Energy Model on Jan 19, 2017, 5:35 am
Hi, I am doing energy simulation for G+4 Labor Accommodation building. In base case, i have considered 2.66 COP. Auto sized as per ASHRAE. In proposed case, VRF System used with... Last reply: Marcus Sheffer, Jan 19, 2017, 9:11 am |
|
Mosquitos eradicate substanceNC-2009 SSp1: Construction Activity Pollution Preventionposted by Tota Yun on Oct 31, 2016, 3:23 am
How I can know if this substance which already used by the contractor in new construction project comply with LEED Last reply: Tota Yun, Jan 9, 2017, 12:11 am |