Not enough parking space within a 60-meter range of the entrances to fit all preferred parkingND-Plan-v4 NPDc5: Reduced parking footprintposted by Pongpitch J. on Jun 8, 2022, 12:41 am
Hi, The project plans to provide 10% carpool and shared-use vehicle parking; however, only some of the preferred parking can fit into the available lots within a 60-meter range of... |
|
Tenant doesn't install water fixtures- can automatically get 1 point for Option 1- water analysis?CI-v4 IPc1: Integrative processposted by Michael on May 12, 2022, 1:15 pm
Hi, My project is interior retail, and they don't install any sanitaryware fixtures in tenant scope. In IP credit, option 1, LEED asked to assess the water fixtures according to WE pre Indoor... Last reply: emily reese moody, May 13, 2022, 6:14 pm |
|
Who can supply Potable water analysis results?NC-v4 WEc3: Cooling tower water useposted by ed HvacSimulator on Apr 17, 2022, 10:44 pm
Hello, We are performing the credit Cooling Tower Water Use and our MEP contractor can supply the Potable water analysis results. Is this possible because we only read "... Last reply: Maeve Donohue, May 5, 2022, 12:18 pm |
|
Do we count all car parking lots of the base building in comparison with the Base ratios?CI-v4.1 LTc5: Reduced parking footprintposted by Michael on Apr 26, 2022, 12:23 am
Hi LEED experts, for option1, in comparison with the Base Ratios, will we just count car parking lots that are owned and used by the fit-out projects? we won't count the entire parking lots of ... |
|
Natural ventilation: what output from CFD model we need to show LEED for compliances?NC-v4 EQp1: Minimum indoor air quality performanceposted by Michael on Apr 20, 2022, 12:22 am
Hi LEED experts, my project is a warehouse, they use natural ventilation through a double side louver. However, the distance between louvers is > 5 times of Ceiling height, which doesn't... |
|
Design of flexibility- Can an open ceiling be counted as an accessible ceiling?CI-v4 MRc2: Interiors life-cycle impact reductionposted by Michael on Apr 4, 2022, 2:54 am
Hi LEED experts, my interior Office wants to have an open ceiling, where people can see and access the piping, ductwork system, and HVAC machines hanging below the ceiling... Last reply: Sarah Buffaloe, Apr 15, 2022, 12:18 pm |
|
Is secondhand furniture automatically qualified?CI-v4.1 EQc2: Low emitting materialsposted by Michael on Apr 6, 2022, 11:05 pm
Hi LEED experts, My interior office project is planning to buy secondhand furniture. Can we consider secondhand furniture reused/salvaged furniture, and therefore automatically meet the... Last reply: Michael, Apr 12, 2022, 1:22 am |
|
Should I register for Campus?LEED Guidance for Campuses and Multiple Buildingsposted by Yun Kim Cheong on Apr 2, 2022, 7:23 am
Posting here again hoping for more guidance. Here's my situation. We have Building A, B and C. Building A is going for LEED Silver, while Building C is going for LEED Certified.... Last reply: Erin Holdenried, Apr 4, 2022, 12:10 pm |
|
Pursue PPA, but install on the roof the projectNC-v4.1 EAc5: Renewable energyposted by Michael on Mar 26, 2022, 9:50 am
Hi LEED experts, My project is planning to use PPA for solar energy. A solar supplier will come to install their own solar panels on the roof of the project and this energy will be used on-site.... Last reply: Marcus Sheffer, Apr 2, 2022, 1:46 pm |
|
Renovation Project with Zero Lot LineCS-v4 WEp1: Outdoor water use reductionposted by Somsak Jidmon on Feb 28, 2022, 9:54 am
I got a renovation project of the 7 stories existing building to the office which aims to be LEED-CS but the project contains zero lot line. Is it possible to pass this prerequisite? Last reply: Somsak Jidmon, Mar 30, 2022, 10:16 am |