Log in
Forum » Asia – East
Topic

Withdrawal of Appeal?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by shashank gangil on Oct 20, 2019, 11:14 pm

Hi

I need this information urgently. We recently got 83 points for a project after final construction review and 1 point was pending. This pending point is actually Regional priority point...

Last reply: Tiffany Beffel, Oct 27, 2019, 7:11 pm

Public Storm Sewer System

EBOM-v4 SSc2: Rainwater management
posted by Simon Sue on Jun 27, 2019, 5:50 am

Hi,

Our project in Shanghai City, China is studying whether it is possible to achieve SSc2. According to the local law, existing rainwater trenches were designed to transport rainwater...

Last reply: Simon Sue, Jun 27, 2019, 9:57 pm

Energy Modelling- Baseline water-cooled chiller's COP, adjusted to local outdoor conditions in lieu of AHRI conditions?

CI-v4 EAc2: Optimize Energy Performance
posted by Andrew Xiao Junzhao on Mar 12, 2019, 4:51 am

Dear LEED APs,

I have a LEED CI v4 project in Taipei, Taiwan, which require whole building energy modelling. Couple of questions I hope to seek clarity:

Question 1:

...

Last reply: Marcus Sheffer, Mar 18, 2019, 3:46 pm

Proof on Exceptional Calculations of Energy Modelling

CS-2009 EAp2: Minimum Energy Performance
posted by Kathy Wong on Jan 7, 2019, 2:13 am

Our LEED project has adopted lighting control as energy-saving strategy for parking garage and documented as exceptional calculation in EAp2 and EAc1. Soon we received USGBC's comment asking for...

Last reply: Kathy Wong, Jan 8, 2019, 4:48 am

Project in 2 separate floor of a same building, can they go for one certification?

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by shashank gangil on Aug 14, 2018, 10:24 pm

We are new to LEED Certification. We are currently bidding for a new LEED v4 ID+C: Commercial Interior Project. The project is currently operating in two floor (26th and 30th), both are separated...

Last reply: shashank gangil, Jan 5, 2019, 4:32 am

To use all FSC Mixed Sources label Paper, how many percentage we need fill into the Purchasing calculator field?

EBOM-v4 MRc1: Purchasing - ongoing
posted by Ray Hsing Chen on Oct 2, 2018, 10:49 pm

Regarding LEED v4 EBOM...

Last reply: Ray Hsing Chen, Dec 18, 2018, 10:23 pm

rainwater recovery at inside boundary, store at outside boundary, Can it be used as a calculation of potable water reduction?

NC-v4 WEp1: Outdoor water use reduction
posted by Ray Hsing Chen on Oct 1, 2018, 3:37 am

Paula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 180 thumbs up December 18, 2018- 11:29 am Hi, Ray! In this prerequisite, the use of rainwater does not come into play. Can you please re-post your question in this forum about the credit? Then I will see if the credit expert can answer this tricky question. Log in or register to post comments ...

Last reply: Paula Melton, Dec 18, 2018, 11:29 am

1/4 mile radious from building boundary

CI-v4 LTc2: Surrounding density and diverse uses
posted by ERM Korea on Jan 31, 2018, 7:31 pm

Hello! I would like to ask about the 1/4 mile radius from building boundary. I have already read the article on FAQ and the one which Emily wrote, but I have a small confusion on it.

When...

Last reply: Alara Brinton, Dec 7, 2018, 1:39 pm

Kitchen faucet nominal flow rate vs maximum flow rate

CI-v4 WEp1: Indoor water use reduction
posted by shashank gangil on Oct 11, 2018, 9:52 pm

We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry. The Manufacturer data mentions 3.4 lpm as"nominal" flow rate of the fixture, which is ...

Last reply: shashank gangil, Oct 12, 2018, 8:04 pm

USGBC rainfall events calculator

NC-v4 SSc4: Rainwater management
posted by Leanne Niu on Nov 29, 2017, 11:01 pm

We could not get the 10 years of the historic daily rainfall data, if we could leave the sheet of historical data blank? and how we calculate the total runoff we need to control on site? 

Last reply: Olga Yuil, Sep 17, 2018, 1:59 pm