Compliance In ScopeCS-2009 PIf4: Schedule and Overview Documentsposted by Guillermo Hernandez Espinoza on Sep 30, 2019, 5:36 pm
Should I include on the TSLA the credits listed on the CS Appendix 4 with compliace "In Scope" or only those ones in which I selected compliance through "Tenant sales and/or lease agreement"?.... Last reply: Summer Minchew, Oct 11, 2019, 8:08 am |
|
Enhanced IAQ Strategies, applicable Entries Querie.CI-v4 EQc1: Enhanced indoor air quality strategiesposted by Angel Giovani Bernal on Sep 19, 2019, 1:58 pm
Hi everybody. I'm working on a commercial interiors project located on the 9th, 12th, 14th & 15th floor. I'm trying to identify the regularly used exterior entrances to the... Last reply: Mohammad H Abbasi, Sep 30, 2019, 10:55 am |
|
Robot parkingCS-v4 INc1: Innovationposted by gabriel Morales on Sep 13, 2019, 12:31 pm
Hello, We have a project in the city of Mexico, the parking is underground with a very special feature, it is robotic, the user will place it in the basement 1 on a platform and from there... |
|
Multi Scene Control for LightingNC-v4 EAp2: Minimum Energy Performanceposted by Gabriela Crespo on Apr 18, 2016, 2:29 pm
Dear all, We're working on a LEED v4 NC project in Mexico. Last reply: Marcus Sheffer, Sep 3, 2019, 2:21 pm |
|
Zero Lot Line Deveoped SiteCS-2009 SSc6.1: Stormwater design - quantity controlposted by Guillermo Hernandez Espinoza on Jul 8, 2019, 5:54 pm
Hi everyone. We are working on a zero lot line site where an old building was demolished in order to start with the new one. Last reply: Guillermo Hernandez Espinoza, Aug 22, 2019, 4:12 pm |
|
Documenting the various Water Efficiency CreditsCS-2009 WEc2: Innovative Wastewater Technologiesposted by Guillermo Hernandez Espinoza on Aug 2, 2019, 2:09 pm
Hi everyone. I'm a bit confused about how to document the different credits, due to the way I should fill the forms. In summary, we achieve a 32% reduction on potable water use by... |
|
Prerequisites Submitted under CampusLEED Rating System Selectionposted by Guillermo Hernandez Espinoza on Jul 2, 2019, 3:56 pm
Hi everyone, I was wondering, since some of the prerequisites are Campus Eligible, does that means I don't have to submitted those prerequisites if earned for the LEED projects inside the campus... Last reply: Bipin Karki, Jul 17, 2019, 3:53 pm |
|
Exhaust not interlocked with HVACNC-2009 EAp2: Minimum Energy Performanceposted by Jorge Lopez de Obeso on Nov 14, 2018, 11:38 am
Hello, we have this residential project were the HVAC system is as follows: Baseline: System 2 - PTHP Proposed: Mini Split System The thing here is that, as known,... Last reply: deuisi cromversa, Jul 10, 2019, 4:43 pm |
|
Scope of creditCS-v4 EQc3: Construction indoor air quality management planposted by ilse angel on Mar 12, 2019, 5:20 pm
During construction there is an stage when the contractor is building the slabs and columns of the levels above the ground floor. Additionally there is no facade or installations yet, and it... Last reply: Tristan Roberts, Mar 12, 2019, 6:09 pm |
|
Development density of the surrounding residential zone or neighborhood (units/hectare) CALCULATION.CS-2009 SSc2: Development Density and Community Connectivityposted by Guillermo Hernandez Espinoza on Mar 1, 2019, 4:20 pm
Hi, we are pursuing the option 2 and we have no problems selecting the 10 basic services within a 1/2 mile since we are located on an urban core area. |