Topic | Recent |
---|---|
MERV 11NC-v4 EQp1: Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on May 17, 2017, 12:48 pm
Hallo, In an office building located in Mexico City (a location with a high PM2.5 and ozone levels), the floors are served by AHU’s equipped with... Last reply: Olman Joaquin Ledezma Unzueta, May 11, 2021, 10:54 am |
|
StrategiesPilot-Credits SSpc55: Bird collision deterrenceposted by Carolina Vasquez on Jun 4, 2020, 1:00 pm
Hi, We have implemented additional strategies at our office with regards to the bird collision detterrence monitoring program but we have registered a couple of bird strikes. I would like... Last reply: Michelle Cordero, Apr 28, 2021, 12:43 pm |
|
Enclosed Parking Garage VentilationCS-2009 EAp2: Minimum Energy Performanceposted by Gabriela Mena on Oct 27, 2020, 10:33 am
Hi, We are working on a CS V2009 project that is willing to control the parking garage ventilation by detecting contamination levels. According to ASHRAE 90.1-2010, the airflow... Last reply: Tyler Thumma, Nov 6, 2020, 9:14 am |
|
Minimun rate ventilation for enclosed parking with contaminant sensorsCS-2009 IEQp1: Minimum indoor air quality performanceposted by Hendrick Munoz on Oct 28, 2020, 12:23 pm
Goord morning, I have a question regarding the minimum rate ventilation for enclosed parkings. For our project, we have an exhaust system for the enclosed parking that has a contaminant... |
|
Documentation Option 1Pilot-Credits IPpc89: Social equity within the communityposted by Carolina Martinez on Aug 17, 2020, 2:54 pm
Our project finished SEED evaluator parts 1 and 2, the only mail we received from them is a blank mail indicating that the project is approved to move forward to part 3. Is this email enough as... |
|
Biodigestion process instead of compostingND-Plan-v4 GIBc16: Solid waste managementposted by LEED Pro Consultant on Jul 27, 2020, 10:58 am
We are trying to achieve the GIB - Solid Waste Management. The project will have recycling stations, a drop-off point for hazardous waste, and recycling containers every 245m. ... Last reply: Eliot Allen, Jul 27, 2020, 11:53 am |
|
Full Occupancy CalculationsEBOM-v4 EQp1: Minimum indoor air quality performanceposted by Giovani Bernal on Jun 1, 2020, 11:58 pm
Our project is a 24 level office building. At least 75% of occupancy has been reached. According to LEED Compliance Guide, for EQ Prerequisite Minimum Indoor Air Quality Performance, for... Last reply: Patrick Murisset, Jun 16, 2020, 3:15 pm |
|
Retail TerraceEBOM-v4 SSc4: Light Pollution Reductionposted by Jorge Lopez de Obeso on Apr 22, 2019, 3:07 pm
Hello everyone, We are working on a project attempting option 2: Perimeter measurements. How should exterior lighting in terraces from retail should be addressed? specifically in this... Last reply: Bill Swanson, May 8, 2020, 9:27 am |
|
Gross floor area modificationCS-2009 PIf2: Project Summary Detailsposted by Silvia Ruiz on Apr 18, 2017, 1:43 pm
Hi If a project size is modified (the... Last reply: Edgar Arevalo, May 5, 2020, 12:59 pm |
|
Individual Thermal Comfort Controls- Open officeCI-v4 EQc5: Thermal comfortposted by Mariana del Valle on Apr 23, 2020, 10:52 pm
Hi! Is there a different alternative to providing individual thermal comfort controls for each workstation in open areas? assuming that the HVAC design is divided by thermal zones, so it... Last reply: Tyler Thumma, Apr 30, 2020, 1:12 pm |