Topic | Recent |
---|---|
Advanced Energy Metering, Opt.2- Data Must Be Remotely AccessibleCI-v4 EAc3: Advanced Energy Meteringposted by Graeme Smith on Feb 18, 2021, 9:08 pm
We under that... "The data must be remotely accessible"... but how does USGBC define remote accessibility? For example, if the power meter installed on level 1 transmits data to a central... Last reply: Graeme Smith, Feb 22, 2021, 4:55 am |
|
Office and residential buildings on a campus site- campus creditsLEED Rating System Selectionposted by Barbora Cicvárková on Feb 22, 2021, 4:51 am
Hi, we have building that is connected with underground parkning and has 5 single sections above ground (section A - E). Three of them are offices and two of them are residential. The... |
|
Reused element in either structure or enclosureNC-v4.1 MRc1: Building life-cycle impact reductionposted by Maria Porter on Feb 22, 2021, 3:45 am
Option 2, path 4 – LCA. “….and incorporate... |
|
Pilot Credits: Safety First- Cleaning and Disinfecting; Re-enter Your WorkplaceNC-v4 INc1: Innovationposted by Bethany Beers on Feb 21, 2021, 12:27 pm
We interpreted the intent of these two COVID-related pilot credits to be: provide a safe working environment during construction. For this project, there is greater risk of COVID-19 transmission... |
|
Base building versus tenant meteringCS-v4 EAp3: Building-level energy meteringposted by Jens Apel on Jul 18, 2017, 8:52 am
Maybe I am overly cautious, but I would like to clarify the following. The Ref.Guide states "... Last reply: Kristina Kouyoumdjian, Feb 19, 2021, 10:35 am |
|
Carpool HoursNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Sadie Martin on Sep 13, 2015, 6:27 pm
Hi, has anyone has success with noting the carpool stalls are only used during certain hours of the day (like during typical office hours)? We have a large garage that is being used by several... Last reply: Douglas Flandro, Feb 19, 2021, 10:04 am |
|
Default contract length for renewable energy procurementNC-v4.1 EAc5: Renewable energyposted by Bryna Dunn on Feb 5, 2021, 1:37 pm
Under the definitions of Tier 1, Tier 2, and Tier 3, there is a statement that reads: "The default contract length for... Last reply: Hashir Usman, Feb 19, 2021, 9:39 am |
|
RPT Section 470 (Green Building LEED Improvement Exemption)LEED v4.1 Discussion Forumposted by Ray Capone on Feb 19, 2021, 9:15 am
Hello, I was wondering if anyone had experience with RPT Section 470 (Green Building LEED Improvement Exemption) (https://www.... |
|
Shower in Mixed Use Residential/RetailNC-v4 LTc6: Bicycle facilitiesposted by Michelle Rosenberger on Feb 15, 2021, 2:45 pm
I am confused about the shower requirement in a residential building that has retail space on the ground floor. The guidance about Mixed Use refers to combining Case 1 - Commercial/Institutional... Last reply: Michelle Rosenberger, Feb 18, 2021, 5:51 pm |
|
Partial "Lumens above Horizontal" calculationNC-v4 SSc6: Light Pollution Reductionposted by Jack Ma on Feb 18, 2021, 2:10 pm
Anyone have experience documenting an uplight light fixture with a permanent... Last reply: Jack Ma, Feb 18, 2021, 3:54 pm |