CARB or SCAQMD | VOC content

NC-v4 EQc2: Low emitting materials
posted by Mario S. on Apr 8, 2019, 7:27 am

Hello,

We have products that are rust preventative coatings tested as per US EPA test method which is the testing method for...

Last reply: Katarzyna Mitura-Papis, Apr 28, 2021, 5:53 am

Whether to open an awarded MRc4 in order to correct a pending MRc7.

NC-2009 MRc4: Recycled Content
posted by Jeff Wiedmeyer on Apr 27, 2021, 4:44 pm

The USGBC reviewer has pointed out that per...

Last reply: Susan Di Giulio, Apr 28, 2021, 2:04 am

Using Autocase to document SSpc113

Pilot-Credits SSpc113: Informing Design Using Triple Bottom Line Analysis
posted by Jennifer Wehling on Apr 27, 2021, 7:05 pm

We used Autocase to document this pilot credit. It was a good process, though we needed lots of help from our account rep, who was thankfully willing to walk us through the process.  We found...

Unmetered Energy Agreement

NC-v4 EAp3: Building-level energy metering
posted by Joseph Snider on Apr 19, 2021, 5:28 pm

Hi - I have a very strange scenario.  The local utility company is providing the site and parking lot lighitng, including installing it and maintaing it.  They are NOT metering it.  The client is...

Last reply: Marcus Sheffer, Apr 27, 2021, 3:25 pm

Source reduction

Pilot-Credits SSpc129: Comprehensive Composting
posted by Trista Little on Apr 23, 2021, 5:02 pm

This credit asks teams to "evaluate...

Last reply: David Posada, Apr 27, 2021, 2:17 pm

non-potable water for wc and urinal flushing means the flow rate for potable water is zero, right?

NC-v4 WEp2: Indoor water use reduction
posted by Afogreen Build on Mar 25, 2020, 4:03 am

Hi all,

Regarding Indoor Water Use Reduction Credit

Would like to check in indoor water calculation, if the project use non-potable water for wc and urinal flushing, that...

Last reply: emily reese moody, Apr 27, 2021, 12:56 pm

Refurbishment project on an existing estate (sort of campus/ business park)

CI-v4 LTc4: Bicycle facilities
posted by Vivien Fairlamb on Apr 27, 2021, 11:20 am

Hi - our project is located on an estate which at the entrances to the estate would meet the 200m distance to bike networks. There is a less than  25MPH speed limit in place across the site but...

Last reply: David Posada, Apr 27, 2021, 11:31 am

Underground infiltaration system as LID practice?

NC-v4.1 SSc4: Rainwater management
posted by Barbara Beckmann on Apr 27, 2021, 2:42 am

For our project a underground...

Construction related credits in a LEED Design submission (LEED Online process)

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Stefen M on Apr 21, 2021, 7:16 pm

Hi all,
We are in the process of submitting a design review for a LEED project. This
may be a simple question, but what should we do regarding targeted credits
where information...

Last reply: Stefen M, Apr 27, 2021, 12:13 am

V4.1 Pilot Credits

NC-v4 INc1: Innovation
posted by Laura Heagler on Apr 26, 2021, 2:25 pm

Can I use a v4.1 Pilot Credit on a project registered under V4?

Last reply: Laura Heagler, Apr 26, 2021, 5:39 pm