Topic | Recent |
---|---|
How can I filled the LEED Online formCS-2009 WEc3: Water Use Reductionposted by Somsak Jidmon on Mar 10, 2015, 3:37 am
My current CS Project using the water saving fixtures and saving the water up to 36% Reduction and our project will used the gray water from waste water treatment plant for all the flush fixtures... Last reply: Somsak Jidmon, Mar 10, 2015, 12:16 pm |
|
Precision Air Conditioning for Server Room and Art GalleryNC-2009 EAp2: Minimum Energy Performanceposted by Panupant Phapant on Mar 4, 2015, 9:31 am
Dear All Last reply: Panupant Phapant, Mar 5, 2015, 9:34 pm |
|
Water Efficiency CalculationNC-2009 WEc3: Water Use Reductionposted by ABDUL MUTHALIB MOHAMED on Dec 30, 2014, 11:44 pm
Hi, Last reply: Maria Rozatti, Mar 2, 2015, 5:59 pm |
|
Domestic Hot Water SystemNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Keerthi Ratnayake on Feb 26, 2015, 2:23 am
Is it a mandatory requirement to install a domestic hot water system in a LEED project? Last reply: Keerthi Ratnayake, Feb 26, 2015, 12:11 pm |
|
Tenant agreement to exclude PFP boxesCS-2009 EAp2: Minimum Energy Performanceposted by Rathnashree Bharadwaj on Feb 17, 2015, 6:46 am
In our project location, it is clear that no tenants will go for a heating system. The... Last reply: Marcus Sheffer, Feb 17, 2015, 12:13 pm |
|
Project boundary issuesHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Muneeb Haider on Feb 17, 2015, 12:14 am
I am doing a project in Lahore, Pakistan for the British Council. It is a 6,000sf library located on a 50,000sf site. The site has two entrances flanked by guard rooms, a prayer area, storage... |
|
Synthetic Enamel's VOCNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Yodi Danusastro on Feb 11, 2015, 4:19 am
Which one from the table that suits for Synthetic Gloss Enamel paint, that use for painting metals? Last reply: Yodi Danusastro, Feb 11, 2015, 11:28 pm |
|
Datacentre RequirementsCI-2009 EAc1.3: Optimize energy performance - HVACposted by Priyadarsi Das on Feb 4, 2015, 7:53 am
Project Description: The project is approximately 3.0 lack Sft which is G+10 floors and going for LEED CI rating. The 9 floors in the project is office space and remaining one floor is... Last reply: Marcus Sheffer, Feb 11, 2015, 6:34 pm |
|
LIFT Lobbies to be included in VRP CalculationsCI-2009 IEQp1: Minimum indoor air quality performanceposted by Preethi Ranjith on Feb 11, 2015, 2:12 am
i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied. Hence is... |
|
Is APPENDIX NeededNC-2009 IEQp1: Minimum indoor air quality performanceposted by ABDUL MUTHALIB MOHAMED on Feb 3, 2015, 9:06 am
In IEQp1 i already Upload 62MZcalc and Results from a Simulation Software and Fill the narrative Tab and all other but my check compliance is still indicate (Y) so my Doubt Whether we... |