Topic | Recent |
---|---|
Categorizing a LEED projectLEED Rating System Selectionposted by Adi Negara, LEED AP BD+C on Mar 10, 2015, 5:40 am
Hello all, ... Last reply: Dave Hubka, Apr 2, 2015, 10:48 am |
|
Process Load of a factory applying LEED CSCS-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on Mar 31, 2015, 10:51 am
I have a factory to be built for rent. Thus, this project goes for CS since we only build the shell. However, since we don't know the detail of a machine to be used (depend on the future tenant/... Last reply: Marcus Sheffer, Mar 31, 2015, 11:32 am |
|
Daylight dimming with manual electric curtainNC-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on Mar 30, 2015, 12:59 pm
My project has a dayligh dimming system and alos the curtain of each window. The reviewer ask me to add the effect of how this curtain will be modeled. Normally this curtain will be operated by... Last reply: Marcus Sheffer, Mar 31, 2015, 10:25 am |
|
Air Curtain in conditioned spaceNC-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on Mar 30, 2015, 12:54 pm
How should we model the air curtain at the building entrance? Should we model as process load for both baseline and proposed? Last reply: Jatuwat Varodompun, Mar 30, 2015, 9:20 pm |
|
CORE area and SHELL areaCS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Yodi Danusastro on Mar 23, 2015, 12:47 am
How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel. How far the... Last reply: Yodi Danusastro, Mar 29, 2015, 9:17 pm |
|
Baseline HVAC Model System-8 VAV PFP Boxes with Outdoor Air UnitNC-2009 EAp2: Minimum Energy Performanceposted by Ivan Priatman on Mar 5, 2015, 11:57 am2015- 6:02 am Hi Ivan, this is becoming software specific and detailed. I suggest you repost this on the energyplus yahoo group support forum. You will get your best help there. If I see it there,... Last reply: Jean Marais, Mar 27, 2015, 6:02 am |
|
Minimum Ventilation rates for Production areaNC-2009 IEQp1: Minimum indoor air quality performanceposted by sriram tetali on Mar 26, 2015, 6:01 am
Hi all Last reply: sriram tetali, Mar 27, 2015, 3:01 am |
|
HVAC System 8 BaselineCS-2009 EAp2: Minimum Energy Performanceposted by CINDY CHAI on Mar 18, 2015, 10:53 am
Hi all, Currently I have a project in Malaysia that is going for LEED Core and Shell (2009), the project consists of multiple buildings but will be certified under one certificate. The... Last reply: Marcus Sheffer, Mar 25, 2015, 8:39 pm |
|
Ancillary site buildingsNC-2009 SSc7.1: Heat island effect - nonroofposted by Erin Holdenried on Feb 18, 2015, 5:32 pm
Are unoccupied ancillary site buildings included in the credit? Or SSc7.2? Thanks for your feedback! Last reply: Devani PERERA, Mar 12, 2015, 11:49 am |
|
Basic Services Provided by the ClientNC-2009 SSc2: Development Density and Community Connectivityposted by Keerthi Ratnayake on Mar 11, 2015, 1:50 am
We have purchased an old factory and currently renovating the buildings to accommodate 2,000 workers. This was an abandoned place and no basic services available. Last reply: Michelle Robinson Schwarting, Mar 12, 2015, 11:06 am |