Topic | Recent |
---|---|
Brownfield site but graded before the construction startedNC-2009 SSc3: Brownfield Redevelopmentposted by Michael Wahjudi on Jun 2, 2015, 3:47 am
Our site is brownfield (existing navy base), but the site is being graded before 1980 to be prepared as industrial area. The current construction activity start at 2014. Can we still consider our... Last reply: Michael Wahjudi, Jun 9, 2015, 12:02 am |
|
Baseline HVAC system choiceNC-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on May 25, 2015, 8:20 pm
Let's Say this building is 26,000 sf which the baseline is system 5-6. What if the exception area is 10,000 sf (process load difference >10... Last reply: Marcus Sheffer, May 26, 2015, 11:02 am |
|
Stormwater not going to municipal infrastructureNC-2009 SSc6.2: Stormwater design - quality controlposted by Michael Wahjudi on May 22, 2015, 2:23 am
We have site that is located about 600m from the sea, hence the stormwater will be discharged to the sea instead going to municipal infrastructure. Hence the quantity and quality for stormwater... Last reply: Michael DeVuono, May 22, 2015, 5:51 am |
|
New addition to existing vs. MPR#2NC-2009 MPR2: Must be a complete, permanent building or spaceposted by maartje van roosmalen on Feb 25, 2015, 5:45 am
Existing (all Last reply: Marcus Sheffer, May 18, 2015, 9:20 am |
|
Fuel types of process energyNC-2009 EAp2: Minimum Energy Performanceposted by Jatuwat Varodompun on May 8, 2015, 11:38 am
We have a new plant using NGV as a fuel to fry potato chip in Thailand. The exact similar technology was used in another plant in China (same potato chip brand) which is already LEED gold... Last reply: Jatuwat Varodompun, May 8, 2015, 9:23 pm |
|
Equipment Capacities for only one building pursue LEEDNC-2009 EAp2: Minimum Energy Performanceposted by Indochine Engineering VN on Apr 24, 2015, 5:36 am
Hi, I have a District energy system (chillers, boilers, cooling towers, pumps) serves 3 buildings but only 1 pursues LEED, so my project doesn't use total capacities of those equipments. My... Last reply: Lawrence Lile, May 7, 2015, 12:15 pm |
|
Open space definitionNC-2009 SSc5.2: Site development - maximize open spaceposted by sompoche sirichote on Apr 20, 2015, 5:00 am
My project is in the industrial area which allows building footprint not exceeding 66% of total site area. So, it means at least 34% of total site area belongs to opening space including roads,... Last reply: Ellen Mitchell, Apr 22, 2015, 3:02 pm |
|
Hi all,NC-2009 EAp2: Minimum Energy Performanceposted by Visu Boj on Apr 14, 2015, 5:57 am
I am working on a certification for a factory having less than 5 percent conditioned area. My process load is also high upto 75 percent. Can any one suggest me how to get savings in optimize... Last reply: Visu Boj, Apr 17, 2015, 1:03 am |
|
Leeds case studyGeneral forumsposted by Rudrabir Ghanti on Apr 15, 2015, 11:40 am
Dear All, I am currently studying Green buildings as a part of my curriculum at premier engg institute ,IIT-Delhi in india where I have been given an assignment to do an analysis of leeds... |
|
SHGC Value ASHRAE 90.1-2007NC-2009 EAp2: Minimum Energy Performanceposted by John Covello on Apr 9, 2015, 7:17 am
Hello everyone, Are the maximum... Last reply: Marcus Sheffer, Apr 9, 2015, 10:14 am |