Log in
Forum » Asia – South and Southeast
Topic

Process Load

NC-2009 EAc1: Optimize Energy Performance
posted by Muzammal Abbas on Aug 18, 2015, 3:06 am

Dear all,
We are doing a factory project in pakistan, which have a 1200 kw process machinery load, after energy modeling without process load we are saving 55 % from baseline but after...

Last reply: Marcus Sheffer, Aug 18, 2015, 9:10 am

To what extent we provide Tenant fitout

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Indochine Engineering VN on Aug 7, 2015, 3:27 am

Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office. I was of the understanding that daylight and view credit require...

Last reply: Eddy Santosa, Aug 7, 2015, 10:10 am

LEED CS 2009- WEp1 & WEc3

CS-2009 WEp1: Water Use Reduction
posted by Ruel Galve on Aug 4, 2015, 6:13 am

We are building a mixed use project, Office, Hotel and Residential to qualify for LEED CS 2009 Gold. Only the office core will have toilets that will be built during C & S construction. The...

Last reply: Candace Pearson, Aug 4, 2015, 10:29 am

Factory Area Classification

NC-2009 IEQc2: Increased Ventilation
posted by SAMY Chamy on Jul 20, 2015, 10:34 am

We have Projects in Bangladesh
1.It have sewing area, Workspaces in which category we classify it (Ashrae 62.1)

1.Sewing Area
2.Cutting Area
3.Inspection area

i...

Last reply: Jon Clifford, Jul 27, 2015, 8:38 pm

OA calculation

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Indochine Engineering VN on Jun 16, 2015, 6:28 am

Hi, I just received the feedback from reviewer. We have...

Last reply: Gustavo De las Heras Izquierdo, Jul 17, 2015, 2:08 pm

Pick up and Drop Facility

CI-2009 SSc3.1: Alternative transportation - public transportation access
posted by Priyadarsi Das on Jul 6, 2015, 8:52 am

We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating. We have provided Pick up and drop facility for the occupants of our...

VRV Units Prescriptive Compliance in LEED CI 2009

CI-2009 EAp2: Minimum Energy Performance
posted by Himanshu Dehra on Jun 16, 2015, 1:00 am

The project is installing VRV units of Daikin (VRV Model # RXYQ18PY16). How shall we go for prescriptive compliance as per ASHRAE 90.1 2007 and Core Performance Guide, since they are not covered...

Last reply: Marcus Sheffer, Jun 17, 2015, 3:49 pm

Power generated in Mini Hydro Power Plant

NC-2009 EAc2: On-Site Renewable Energy
posted by Keerthi Ratnayake on Jun 1, 2015, 7:44 am

Hi,

We have a mini hydro power plant project. Can we accommodate the total power generated in the plant towards this credit?

Thanks!

Last reply: Marcus Sheffer, Jun 16, 2015, 2:39 pm

Lighting control in Tenant space

CS-2009 EAp2: Minimum Energy Performance
posted by Indochine Engineering VN on Jun 16, 2015, 1:03 am

Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE. Item 9.4.1.1 says automatic control...

Last reply: Marcus Sheffer, Jun 16, 2015, 9:45 am

Data Center Baseline HVAC System with Ancillary Office Spaces

Data-Centers-NC-v4 EAp2: Minimum Energy Performance
posted by Rajesh Balachander on Jun 4, 2015, 1:54 am

Hi Marcus

Your comments and Suggestions were valuable for my understanding on doing my LEED EM for Data Center. I would like to confirm on my understanding. I have a 7 storey building of...

Last reply: Marcus Sheffer, Jun 10, 2015, 9:06 am