Topic | Recent |
---|---|
Location of OA monitor at PAU or AHUsNC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Indochine Engineering VN on Oct 8, 2015, 4:04 am
Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every... Last reply: Andrew Mitchell, P.E., Oct 13, 2015, 1:55 pm |
|
Certify some of multiple fitout floorCI-2009 MPR2: Must be a complete, permanent building or spaceposted by sompoche sirichote on Oct 5, 2015, 10:11 pm
Our client will rent 8,10-20 floor within 20 stories building. |
|
Biomass for process steamNC-2009 EAp2: Minimum Energy Performanceposted by Melissa Merryweather on Oct 1, 2015, 2:08 am
I am working on a factory that uses process steam, which accounts for about half of the whole energy use. All the process steam is generated by a biomass steam boiler; the fuel being agricultural... Last reply: Christopher Schaffner, Oct 3, 2015, 11:42 am |
|
ATM and Driving SchoolNC-2009 SSc2: Development Density and Community Connectivityposted by Michael Wahjudi on Sep 24, 2015, 9:32 pm
Hi all, need to get some guidance here. Can ATM considered as "bank"? Since the ATM is having full capability of banking services, except opening bank account. Additionally, can driving school... Last reply: Michelle Robinson Schwarting, Sep 28, 2015, 10:34 am |
|
Mandatory requirementsNC-2009 EAp2: Minimum Energy Performanceposted by Rathnashree Bharadwaj on Sep 25, 2015, 1:08 am
Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance. In continuation with that discussion, i request for a couple of... Last reply: Marcus Sheffer, Sep 25, 2015, 10:56 am |
|
CO2 SENSOR IN AN UNDERGROUND METRO STATION.NC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by VEL MUTHU on Sep 12, 2015, 2:11 pm
Hello everyone, I am working in a underground metro station which is aiming for LEED certification. I am facing difficulties with placing... Last reply: Andrew Mitchell, P.E., Sep 15, 2015, 10:37 am |
|
HVAC duct insulation adhesiveNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Gaura Saxena on Aug 27, 2015, 12:11 am
Hi Last reply: Jon Clifford, Aug 31, 2015, 8:17 pm |
|
62MZ calc for critical zonesNC-2009 IEQp1: Minimum indoor air quality performanceposted by Indochine Engineering VN on Aug 27, 2015, 12:01 am
Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there. I plan... |
|
LEED CS 2009 EAc1CS-2009 EAc1: Optimize Energy Performanceposted by Ruel Galve on Aug 24, 2015, 5:11 am
We are currently doing a LEED 2009 CS - GOLD project in Jakarta. The question is: Do we need to select our equipment (pumps and fans) based on the recommended baseline building design... Last reply: Ruel Galve, Aug 25, 2015, 10:04 pm |
|
Accidentally Opened Awarded Credit during Appeal StageLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Bernard Sagaiyaraj on Aug 12, 2015, 5:19 am
My team member accidentally opened 2 awarded credits during the Appeal Stage for some other non-compliance credits. No changes were made to the form. Can we appeal to... Last reply: Marcus Sheffer, Aug 25, 2015, 9:06 am |