Topic | Recent |
---|---|
Major Renovation Building Energy ModellingNC-2009 EAp2: Minimum Energy Performanceposted by SAMY Chamy on Dec 21, 2015, 2:05 am
Dear All We are currently working on a Major Renovation Building. we are confused a lot in selecting a base case for Energy Modelling 1.Is there any specific modelling guidelines... Last reply: Marcus Sheffer, Dec 22, 2015, 10:19 am |
|
Rating system: NC, CI or EBOM?LEED Rating System Selectionposted by Melissa Merryweather on Jul 28, 2015, 2:06 am
I seem to be posting on this thread constantly! I wish I had a straight-forward LEED project. My current concern is a single university building. They will renovate about 90% of the interior in 2... Last reply: OSCAR DE LA RED, Dec 21, 2015, 5:32 am |
|
2 year 24 hour design stormNC-2009 SSc6.1: Stormwater design - quantity controlposted by ABDUL MUTHALIB MOHAMED on Dec 16, 2015, 8:04 amDecember 16, 2015- 1:28 pm You do not have enough data to discern anything from what you have posted. What you are trying to do is not easy, and is well outside the scope of this forum. I suggest you read... Last reply: Omar Elrawy, Dec 20, 2015, 7:55 am |
|
Problem with FSC and COC shipped from other country.NC-2009 MRc7: Certified Woodposted by Somsak Jidmon on Dec 8, 2015, 11:11 pm
We have the LEED NC 2009 project that under construction and we attempt to get the credit of MRc7 -... Last reply: Somsak Jidmon, Dec 15, 2015, 10:29 pm |
|
LEED CS building with very minimum landlord provisionCS-2009 EAp2: Minimum Energy Performanceposted by Michael Wahjudi on Dec 10, 2015, 11:27 pm
Hi all, I have LEED CS with very minimum client provision without AC systems (only emergency lights, emergency fans and lifts). But the main tenant has been agreed from the building and the... Last reply: Michael Wahjudi, Dec 15, 2015, 2:07 am |
|
Doing monthly photo report of IAQ managementNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Indochine Engineering VN on Dec 13, 2015, 11:35 pm
Hi, My project is under construction, but just structural work (finalizing substructure and launching superstructure). It is long way to furnishing and MEP work onsite. I have read several... Last reply: Susan Walter, Dec 14, 2015, 6:25 pm |
|
ASHRAE 55- apartmentNC-2009 IEQc7.1: Thermal comfort - designposted by Indochine Engineering VN on Aug 30, 2015, 11:08 am
My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally. I'm wondering how to document for this credit: do I... Last reply: Christopher Schaffner, Dec 11, 2015, 4:50 pm |
|
Floor joists part of interior?NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by John Covello on Dec 10, 2015, 10:21 pmLast reply: Ralph Bicknese, Dec 11, 2015, 10:41 am |
|
Glass DoorsNC-2009 IEQc8.1: Daylight and views - daylightposted by John Covello on Dec 8, 2015, 4:23 am
Hello, Do Glass Doors count as windows and require automatic glare control? Last reply: TODD REED, Dec 11, 2015, 7:51 am |
|
Natural ventilation for residentialCS-2009 IEQp1: Minimum indoor air quality performanceposted by mai elly on Jan 21, 2015, 3:06 am
HI, 1. Could I use the sliding door as operable wall/window to supply the fresh... Last reply: Michael Brown, Dec 10, 2015, 10:01 am |