Topic | Recent |
---|---|
Method to Achieve Thermal- Comfort for Ventilated AreaNC-2009 IEQc7.1: Thermal comfort - designposted by SAMY Chamy on Aug 31, 2015, 4:15 am
Hai Everyone:- Our project is sewing factory It is not fully conditioned (A/C & Ventilation) 1.A/c for Office area Last reply: Christopher Schaffner, Jan 25, 2016, 10:44 am |
|
Construction Activity and Pollution PreventionNC-2009 SSp1: Construction Activity Pollution Preventionposted by JP Rout on Jan 22, 2016, 1:28 am
We have Project intending to be registered under LEED 2009 BD+C for major renovations. This is an existing building which will undergo major renovation work for the interiors, HVAC and a large... Last reply: JP Rout, Jan 25, 2016, 4:13 am |
|
Need Registration guidance for an upcoming Hospital campusLEED Guidance for Campuses and Multiple Buildingsposted by Neha Singhal on Jan 14, 2016, 9:16 am
We have a Medical institution coming up at Faridabad (India), which contains various types of building, where the construction would be carried out simultaneously for all the blocks. The site... Last reply: Jon Clifford, Jan 17, 2016, 11:51 am |
|
Site Surrounding that Partially DevelopedNC-2009 SSc2: Development Density and Community Connectivityposted by Michael Wahjudi on Aug 14, 2015, 2:49 am
Our project is located at site that the surrounding site partially already developed and able to meet the development... Last reply: Marilyn Specht, Jan 12, 2016, 9:47 pm |
|
Recycled content in Steel frame of facadeNC-2009 MRc4: Recycled Contentposted by Indochine Engineering VN on Jan 6, 2016, 1:54 am
Hi, I would like to ask in case that facade manufacturer cannot confirm... Last reply: RETIRED, Jan 11, 2016, 1:18 pm |
|
Use of Table fans in Working DeskNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by SAMY Chamy on Dec 21, 2015, 8:48 am
Dear all Our production area is sewing machines so we install table fan with switches in every sewing table. Is it acceptable method in Individual controls Is there any... Last reply: Lauren Sparandara, Jan 8, 2016, 1:15 pm |
|
Water Consumption Outside LEED BoundaryNC-2009 WEp1: Water Use Reductionposted by Aswin M on Dec 24, 2015, 4:06 am
We have a garment factory project that has a Main block and two toilet blocks (separately for Men & Women). Last reply: Melissa Merryweather, Jan 3, 2016, 11:52 pm |
|
Single Building Certification_LEED New Construction 2009NC-2009 MPR2: Must be a complete, permanent building or spaceposted by Aswin M on Dec 23, 2015, 5:42 am
We have a Garment factory project that has three blocks with connectivity bridge. Last reply: Jon Clifford, Dec 30, 2015, 12:06 am |
|
100% outdoor air indirec evaporative cooling systemNC-2009 EAp2: Minimum Energy Performanceposted by BEE Incorporations on Dec 27, 2015, 9:41 pm
Hi everybody, Last reply: Marcus Sheffer, Dec 28, 2015, 11:08 am |
|
100% outdoor air indirect evaporative cooling systemNC-2009 EAp2: Minimum Energy Performanceposted by BEE Incorporations on Dec 27, 2015, 9:51 pm
Hi everybody, Last reply: Omar Elrawy, Dec 28, 2015, 5:13 am |