Topic | Recent |
---|---|
District heating pricesNC-v4 EAp2: Minimum Energy Performanceposted by Azra Semic on Sep 13, 2023, 5:59 am
Hello, |
|
Green Infrastructure and Buildings: What should be rating system for the chosen building?ND-Plan-v4 GIBp1: Certified green buildingposted by Marine Petrosyan on Sep 12, 2023, 5:27 am
Hi, All! The GIB Prerequisite states, that at least one whole building should be LEED certified. I understand that for the who neighborhood the given LEED v4 ND Plan will work. BUT, what... Last reply: Marine Petrosyan, Sep 13, 2023, 2:23 am |
|
WaterSense Tool available only for US and Canada?CS-v4 WEp1: Outdoor water use reductionposted by Marine Petrosyan on Sep 4, 2023, 6:47 am
The LEED Online forms say, that WaterSense Tool supports only zip codes of US and Canada. Does this mean that the tool is not suitable for projects outside the US and Canada? Thank you.... Last reply: Marine Petrosyan, Sep 13, 2023, 2:18 am |
|
Want to consider 30% fresh air in printing areasCI-v4 EQp1: Minimum indoor air quality performanceposted by Nagaraj Sankar on Sep 10, 2023, 11:23 pm
Hi users, Last reply: Nagaraj Sankar, Sep 13, 2023, 12:53 am |
|
Any initial findings regarding Project Appendix G performance under v4.1 compared to v4 (or even v3)?NC-v4.1 EAc2: Optimize Energy Performanceposted by Joanna Switzer on Sep 24, 2019, 4:09 pm
Hi all, Given the number of variables that have changed between v4 and v4.1 Optimize Energy analysis protocol, I am uncertain how to accurately preface the likely impact / rigor involved... Last reply: Jamy Bacchus, Sep 12, 2023, 4:09 pm |
|
Lighting Boundary Modification- Light Trespass: Option 1. BUG Rating Method Only?NC-v4 SSc6: Light Pollution Reductionposted by Lenka Matějíčková on Aug 30, 2023, 2:30 pm
The LEED manual states that, under certain conditions, the lighting boundary can be modified (e.g.when the property line is adjacent to a public street, alley, or transit corridor, the lighting... Last reply: Glenn Heinmiller, Sep 12, 2023, 10:56 am |
|
Native plants = No Irrigation Required?NC-v4 WEc1: Outdoor water use reductionposted by Yoyo Shek on Jan 24, 2022, 6:40 am
Hi All, Noted in the Step-by-Step Guidance, Step 2. Option 1. saying that:
Last reply: Maiz Rech, Sep 12, 2023, 9:41 am |
|
Natural vs mechanical ventilationNC-v4 EQp1: Minimum indoor air quality performanceposted by Dina El-Sady on Sep 11, 2023, 11:42 pm
A project has a production building with a warehouse and is beinng naturally ventilated with exhaust air louvers and fresh air louvers .The machinery has direct exhaust fans to remove heat... |
|
Pre-cast concrete structure environmental product declarationsNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Maiz Rech on Sep 11, 2023, 2:17 pm
Considering the building is built of a precast concrete... |
|
Storage locationNC-v4 MRp1: Storage and Collection of Recyclablesposted by Maiz Rech on Sep 11, 2023, 1:33 pm
Is there a minimum distance or positioning requirement for this area? Would it be a problem to locate the recyclables storage on the building underground floor? Last reply: Maiz Rech, Sep 11, 2023, 2:00 pm |