Bird glazing that meets quality views credit requirements

NC-v4 EQc8: Quality Views
posted by Blake Weaver on Dec 7, 2023, 10:01 am

I have an owner that is interested in installing bird glazing for their Airport project. We are pursuing the quality view credit which somewhat limits our options for bird safe glazing. Acid...

Last reply: Afogreen Build, Apr 17, 2024, 8:57 pm

Would a fire sprinkler system count as "other process water"

NC-v4 WEc4: Water metering
posted by Cindy Quinn on Apr 16, 2024, 9:08 pm

Has anyone had success with a fire sprinkler system being one of the subsystems?  Would it count as "other process water"?

TIA!

Last reply: Andrey Kuznetsov, Apr 17, 2024, 2:46 am

Waste management plan submission with multiple GC's

NC-v4 MRp2: Construction and demolition waste management planning
posted by Blake Weaver on Dec 21, 2023, 4:52 pm

I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different...

Last reply: Afogreen Build, Apr 16, 2024, 9:00 pm

No Cooling Tower

CS-v4 WEc3: Cooling tower water use
posted by Adriana Hansen on Jan 2, 2024, 11:46 am

Regarding the alternative compliance path to the LEED v4 credit Cooling tower water use (BD+C)<https://www.usgbc.org/node/2611780>, a...

Last reply: Afogreen Build, Apr 16, 2024, 8:57 pm

Pilot Closed- attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94: No Cooling Tower
posted by Adriana Hansen on Apr 16, 2024, 1:45 pm

This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1...

Pilot Closed- attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94: No Cooling Tower
posted by Adriana Hansen on Apr 16, 2024, 1:39 pm

This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1...

Number of eligible Innovation credits from Pilot Credits

NC-v4 INc1: Innovation
posted by Jason Garvens on Jan 15, 2018, 12:00 pm

Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? 

The way I read the requirements in the Innovation section it would appear to be up to...

Last reply: Afogreen Build, Apr 15, 2024, 8:59 pm

EAc2 Optimize Energy Performance: Baseline Building Heating Source

NC-v4 EAc2: Optimize Energy Performance
posted by Ricardo Sá on Apr 27, 2023, 5:43 am

Hello.

I have a question regarding LEED v4 NC, EAc2 Optimize Energy Performance:

We’re currently involved in a project that is considering the use of biomass as heating source (...

Last reply: Afogreen Build, Apr 15, 2024, 8:55 pm

Wind PPA OR PV garden question

NC-v4 EAc5: Renewable energy production
posted by Kyu-min Lee on Apr 15, 2024, 1:29 pm

Hello,LEEDuser!!!!

My project is planning to contract at least 10year more than 10 Gwh.(not confirmed about wind or PV but the amount is fixed, located in same utility service area)

...

Last reply: Kyu-min Lee, Apr 15, 2024, 4:28 pm

CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?

NC-v4 MRp2: Construction and demolition waste management planning
posted by Olga Yuil on Apr 15, 2024, 3:55 pm

For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C.

According to those...