Forum quick links
INpc 137 Safety First: Cleaning your space for emerging pathogens
NC-v4 INc1:Innovationposted by Glen Boldt on
What are some other testing strips that are readily available to test the cleanliness of a surface?
Overall credit experience
Pilot-Credits EQpc116:Daylight in nonregularly occupied spacesposted by Valeria Fiorentino on
As the project was already pursuing Daylight credit we have been able to use the same simulation tool for this piot credit.
water leak detection pilot credit?
CS-v4 WEp2:Indoor water use reductionposted by Sareet Benayahu on
Hi all,
Occupant usage of tenant fixtures is less than 100%
CI-v4 WEp1:Indoor water use reductionposted by Nadia Azzam on
We are working on a tenant fit-out for a specialty group occupying the entire 3rd floor and part of the 1st floor in a LEED-certified building.
Interiors Life-Cycle Impact Reduction - Option 3 Design for Flexibility
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Laura Riegle on
Hi,
I am persuing the "Interiors Life-Cycle Impact Reduction" credit, Option 3: Design for Flexibility for a CI project.
Data Center LPD
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by David Edenburn on
When we use the S-by-S method we have problems with some rooms being over-lighted. On average, we are pretty good.
LEED System Selection for Existing Renovation Hotel
posted by Teerawat W. on
Dear all LEED users,
Zero Lot Line with required streetscape
NC-v4.1 MPR2:Must use reasonable LEED boundariesposted by Elena Khoury on
Can streetscape can be excluded from a project boundary if it's required by municipality?
Tally as the LCA Database/Tool
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Charlie Levy on
We are currently considering pursuing this credit for a project. However, I am not sure what the definition of an "approved data provider" would be.
ASHRAE 90.1 Baseline IT energy - Data Centres
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Gregory Mason on
We are looking at a Data Centre that is targeting LEED certification in Australia, but struggling to get many energy points due to the high proportion of IT equipment as the total electricity of th