LEEDonline: uploading documents in master siteNC-v4 LTc6: Bicycle facilitiesposted by N. Josef Nassif on Mar 24, 2023, 5:58 am
Accroding to Guide Campus approach, it states the following: Eligible.” This credit may be documented once at the level of the master site, and then individual within the master site... |
|
Switch Optimize Process Water use V4.1CS-v4.1 WEc3: Optimize Process Water Useposted by Michaël Briffaz on Dec 12, 2022, 8:22 am
Hi Everyone, For a C&S project in LEED V4, I'm thinking to switch "Cooling Tower Water" in V4.1 "Optimize... Last reply: Marelle Davey, Mar 20, 2023, 12:38 pm |
|
Waling Distance 400 m or 800 m?CS-v4 LTc5: Access to quality transitposted by Stephan Zweig on Feb 10, 2023, 3:26 am
Dear all, 1) Does subway station as... Last reply: Konstantina Kalliakoudi, Feb 13, 2023, 10:58 am |
|
Cooling tower (no refrigerants) and some small units (with gwp > 10)NC-v4 EAc6: Enhanced Refrigerant Managementposted by Janine van den Kerkhof on Jan 30, 2023, 4:55 am
Hi all, Can we include the capacity of the cooling towers in the weighted average calculation? This will cover most of the cooling in our building. However we do need to include some... |
|
Air Curtains in ASHRAE/IES Standard 90.1-2019NC-v4 EAp2: Minimum Energy Performanceposted by Nima Soltani on Oct 29, 2021, 7:56 am
Recent ASHRAE/IES Standard 90.1-2019 Updates include the possibility of installing an air curtain system instead of installing a Vestibule / Revolving Door Entrance. Can this ruling be... Last reply: Jamy Bacchus, Nov 22, 2022, 8:52 pm |
|
CxA Experience ValidationCS-v4 EAc1: Enhanced Commissioningposted by Michaël Briffaz on Oct 19, 2022, 9:21 am
Hey, We would like to submit the experience and references for a... |
|
Does LEED BD+C Core and Shell have disadvantages against ESG compliance?LEED Rating System Selectionposted by Leonie Wipf on Oct 18, 2022, 11:09 am
For a new built office the most suitable rating system seems to be Core and Shell. Besides LEED certification the project should demonstrate ESG compliance. Does ist still make sense to get Core... |
|
Enhanced acoustical performance- exterior noise controlWarehouses-NC-v4 INc1: Innovationposted by Kathrin Wiedermann on Oct 13, 2022, 11:25 am
Hello, A german project is going to be buildt on industrial area next to a... |
|
Parking Lots at undergraound at the basementNC-v4 LTc7: Reduced parking footprintposted by Stephan Zweig on Oct 5, 2022, 4:33 am
Hello, I have following question: If in a project there are parking lots in the building at the basement, can this project be eligible for the credit “reduced parking”? ... Last reply: J Schütz, Oct 7, 2022, 5:19 am |
|
BD+C MAJOR RENOVATION- How is mahor renovation defined?LEED Rating System Selectionposted by Stephan Zweig on Oct 5, 2022, 4:29 am
Hello, For rating system BD+C Major Renovation: How is Major Renovation Defined? Is there a proving document required to upload to state that the existing building is under MAJOR... |