Can rainwater reuse system meet the requirment of this credits?EBOM-v4.1 SSc1: Rainwater managementposted by XIN CHANG on Jul 21, 2020, 11:34 pm
Dear LEED experts I have a doubt that wheater a project can earn this credits if only rainwater... Last reply: Trista Brown, Jul 27, 2020, 6:46 pm |
|
Hazard identify for the project outside of the USPilot-Credits IPpc98: Assessment and planning for resilienceposted by Junko Miyamoto on Jul 8, 2020, 3:29 am
Hi all, There is no hazard risk disclosure of Wildfire, Drought and Landslides and Unstable Soils in the project site. Because Japan where is the project site has no experience in those... |
|
which standard to be refered to get the LRV of different wall, ceiling and floor?CI-v4 EQc6: Interior lightingposted by Leanne Niu on Nov 5, 2019, 1:58 am
I will submit a project to get this point, but i don't know which standard to be refered for LRV of different materials. Thanks! Leanne Last reply: Mikhail Davis, Apr 14, 2020, 7:02 pm |
|
China GHG FactorsPilot-Credits EApc95: Alternative Energy Performance Metricposted by Heather Walters on Mar 31, 2020, 1:22 pm
Has anyone had success finding... |
|
Item C Filtration under Option 1.CI-v4 EQc1: Enhanced indoor air quality strategiesposted by Hannah Wong on Nov 28, 2017, 1:49 am
The requirement mentioned that ventialtion system that supplies outdoor air to occupied spaces must has particle filters or air-cleaning device that has filtration media meeting... Last reply: Hannah Wong, Feb 6, 2020, 10:02 pm |
|
thermal control for the energy savingPilot-Credits EQpc114: Learning controls for thermal comfortposted by Jinyong Song on Jan 2, 2020, 8:01 pm
Thermal comfort and energy saving seem to be closely related. For a store project, energy saving is required more than thermal comfort of space. Actually in Korea, we regulate... |
|
how do you manage providers that provide the right materials for LEED?Pilot-Credits SSpc55: Bird collision deterrenceposted by kim sung on Oct 27, 2019, 10:29 am
Hello. There is a question as a preliminary contractor for bird collision deterrence. If I had a way to lower a threat factor to 15 or less as an alternative to bird collision,... Last reply: Stephanie Graham, Dec 4, 2019, 6:23 pm |
|
Bird Collision DeterrencePilot-Credits SSpc55: Bird collision deterrenceposted by Long Wang on Jun 24, 2018, 11:03 am
Hi, I have two questions of this pilot credit for our LEED EB: O+M project V4. First, what specific requirements for the external facade, especially the glass. The other one is the... Last reply: Stephanie Graham, Dec 4, 2019, 5:50 pm |
|
Product Category Testing as per GB China standards.CI-v4 EQc2: Low-emitting materialsposted by Mahesh Shankar on Nov 18, 2019, 4:27 am
We have a CI Office project in Shanghai, where we are attempting for Low Emitting materials credit. The testing for three categories of materials that we have, are as per GB China standards. In... Last reply: Reinhard Oppl, Nov 18, 2019, 7:09 am |
|
Envelope Cx TestingNC-v4 EAc1: Enhanced Commissioningposted by Erin Rowe on Nov 4, 2019, 8:52 pm
I'm working on a project with envelope... Last reply: ESD Engineer, Nov 4, 2019, 9:46 pm |