Topic | Recent |
---|---|
Renewable Energy Cost Saving for LEEDv4NC-v4 EAc2: Optimize Energy Performanceposted by Daniel Ohnuma on Aug 29, 2017, 2:36 pm
The LEED v4 Guide steps that it's possible only apply any savings from ON-SITE... Last reply: Marcus Sheffer, Sep 1, 2017, 2:37 pm |
|
ANSI/ASTM-E779 versionCS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by MARCIO OROFINO on Feb 23, 2017, 9:40 am
We have a project in Rio de Janeiro registered under CS and to which the fan door test shall be conducted since it is composed of three residential buildings. In Brazil, the test has not been... Last reply: Trista Brown, Aug 30, 2017, 5:20 pm |
|
Dist. Center- Light polutionWarehouses-NC-v4 SSc6: Light Pollution Reductionposted by Antonio Macedo Filho on May 23, 2017, 11:26 am
If the design of a distribution center worked 24 hours in 3 shifts, even at night, could we not get that credit? If we use external lighting with zone presence sensors would not it be possible?... Last reply: Bill Swanson, Aug 28, 2017, 11:55 am |
|
Window-sillNC-v4 EQc8: Quality Viewsposted by Antonio Macedo Filho on Aug 16, 2017, 4:19 pm
I would like to know if there is a maximum obstruction height of views for option 1. In the case in my project, if it is an office building, with a central atrium and in that atrium, we would... Last reply: TODD REED, Aug 28, 2017, 7:30 am |
|
IEQ c4.2 Paints- Laboratory tests according to SCAQMD Rule#1113Schools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatingsposted by Andrea Tayah Esperão Malta de Campos on Aug 10, 2017, 5:16 pm
In a LEED 2009 CS project in Brazil and a Epoxi Paint was used in a parking garage. The lab test indicates the brazillian standard ABNT NBR 16388 – (Determinação do teor de compostos orgânicos... Last reply: Tristan Roberts, Aug 26, 2017, 8:07 pm |
|
2012 EPA CGP comply with this prerequisite?CS-2009 SSp1: Construction Activity Pollution Preventionposted by Pamela Svetllana Santos Souza on Jul 14, 2017, 7:13 am
I'm modelling for LEED C&S 2009 and the project has 26 floor type of mixed-use offices. Does the 2012 EPA... Last reply: Tristan Roberts, Aug 26, 2017, 6:10 pm |
|
Core & Shell RetrofitCS-v4 SSc1: Site assessmentposted by Juliana Malho on Jun 9, 2017, 9:07 am
I'm wondering if the credit is achievable by retrofit projects. In my case the site is previous developd and 100% imperviousness by the existing construction including parking lots and the... Last reply: Tristan Roberts, Aug 26, 2017, 12:38 pm |
|
Shades and blindsNC-v4 EQc7: Daylightposted by Antonio Macedo Filho on Aug 16, 2017, 1:07 pm
I'm working on an office project, and there's an atrium. We want to use a translucent and permeable tensioning fabric on the roof of this atrium. Could this... Last reply: TODD REED, Aug 17, 2017, 10:41 am |
|
ViewsNC-2009 IEQc8.2: Daylight and views - viewsposted by Antonio Macedo Filho on Aug 16, 2017, 4:31 pm
I would like to know if there is a maximum obstruction height of views for option 1. In the case in my project, if it is an office building, with a central atrium and in that atrium, we would... Last reply: TODD REED, Aug 17, 2017, 9:29 am |
|
BrownfieldCS-v4 LTc3: High priority siteposted by Antonio Macedo Filho on Jun 23, 2017, 12:32 pm
Hi Tristan, I have a project in a... Last reply: Tristan Roberts, Jul 7, 2017, 4:37 pm |