BD+C vs ID+C Rating System SelectionRetail-CI-v4 MPR2: Must use reasonable LEED boundariesposted by Sofia Barahona on Jan 5, 2022, 4:21 pm
We are working on a Retail (fast food store) that is currently in the LEED registration process. We are confused with the selection of the rating system because we were originally treating it as... |
|
Pilot-Credits WEpc94- No Cooling TowerPilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Dec 8, 2021, 6:30 pm
We would like to know if there is an estimated date of closure. We have many projects that don´t have cooling tower but attends the requirements of the pilot and have the baseline system... Last reply: Irene García Sáez, Dec 23, 2021, 2:45 pm |
|
Roll out mats specifications?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Victoria Rios Esteve on Nov 3, 2021, 1:13 pm
Hi everyone! On our project, we are placing rollout mats on the exterior but under roof hanging. Do you have any suggestion on brand/model/type we can get to achieve this credit? Any... Last reply: Afogreen Build, Dec 21, 2021, 6:04 pm |
|
Prevention through Design- BOD e OPRPilot-Credits IPpc93: Prevention through designposted by Adriana Hansen on Jun 10, 2021, 5:14 pm
Hello, We are trying to get credit on a project and would like to know if the items studied for credit need to be described in the... Last reply: Dionisio Franca, Dec 14, 2021, 11:02 pm |
|
Bird collisions/Interference in the migratory routePilot-Credits SSpc55: Bird collision deterrenceposted by Ricardo Gomes on May 26, 2021, 9:34 am
I’m curious if there is a pattern flight height for migratory birds. Our project is close to a large road network, with a lot of green area and along a flight corridor, landing, resting, feeding... Last reply: Sumaiya Mehjabeen, Dec 1, 2021, 11:47 am |
|
Multitenant BuildingEBOM-v4 MPR2: Must use reasonable LEED boundariesposted by Sofia Barahona on Oct 15, 2021, 4:12 pm
We are currently carrying out the feasibility study for the certification of an existing project in Operation and Maintenance v4.1: Existing Buildings. It is a multitenant building and the... Last reply: Sofia Barahona, Nov 12, 2021, 7:09 am |
|
Natural ventilation room by room calculationCS-v4 EQc1: Enhanced indoor air quality strategiesposted by Agustin Bertolotti on Nov 2, 2021, 3:29 pm
Hi everyone We are working on a residential building that will not have mechanical ventilation on it´s units, so the natural ventilation strategy will be applied and all living spaces... |
|
one or two buildings?LEED Guidance for Campuses and Multiple Buildingsposted by Victoria Rios Esteve on Oct 4, 2021, 11:31 pm
Hi everyone! We are working on the LEED v4 certification of two high-rise residential buildings under NC format. Buildings are not similar in their interior distribution and are connected... Last reply: Eric Anderson, Nov 2, 2021, 11:37 am |
|
SSp1 Required informationNC-2009 SSp1: Construction Activity Pollution Preventionposted by Victoria Rios Esteve on Jul 24, 2019, 3:01 pm
Hi everyone! I´m pretty new at LEED certification process, so I will really appreciate your help. We are close to upload the construction submittal on a project we have been... Last reply: Allen Cornett, Oct 27, 2021, 2:22 pm |
|
MERV 8 upstream cooling coilsEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Paula Hernandez on Oct 12, 2021, 3:24 pm
Hi, We are working in an... Last reply: Paula Hernandez, Oct 14, 2021, 6:19 am |