No longer required to complete Design prereqs before review?

NC-2009 EAp2: Minimum Energy Performance
posted by Susan Di Giulio on Jan 14, 2015, 10:32 pm

From what I have read about the new website, it is no longer required to complete all design prerequisites before submitting for Design Review (split review assumed).

We have been hung...

Last reply: Marcus Sheffer, Jan 14, 2015, 10:44 pm

LEED Boundary / Silt Fencing

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Carrie Laurendine on Dec 30, 2014, 6:02 pm

Currently working on a project that is a large site with an existing building currently on the site. The new LEED building is away from this current building creating a smaller LEED Boundary than...

Last reply: Carrie Laurendine, Jan 14, 2015, 1:04 pm

EAp2 Domestic Hot Water Pump sizing

NC-2009 EAp2: Minimum Energy Performance
posted by MKK LEED on Jan 12, 2015, 7:57 pm

Hello,
Appendix G Table G.3.1 - Service Hot water systems states "The service hot-water system in the baseline building design shall use the same energy source as the corresponding...

Last reply: Marcus Sheffer, Jan 13, 2015, 10:24 am

Indoor/Outdoor Pool

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Tom Liebel on Jan 12, 2015, 2:36 pm

We're wrestling with the walkoff mat requirement for a recreation center where there is an indoor/outdoor pool - one end of the pool and the roof retract during clement weather to provide an...

Last reply: Michelle Halle Stern, Jan 12, 2015, 4:15 pm

NC V4: Advanced Energy Metering of Entire Building

NC-v4 EAc3: Advanced Energy Metering
posted by Erik Gutierrez on Jan 9, 2015, 1:22 pm

Hello all,

I'm looking at metering a new construction building with a single controller. The specific controller that I'm looking at has the capability to monitor each individual end use (...

Last reply: Marcus Sheffer, Jan 12, 2015, 3:19 pm

EAp1-1 Commissioning Report Upload Location Missing

CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Sam Stoltze on Jan 9, 2015, 2:57 pm

The new LEED Online interface seems to be missing the ability to upload a...

Last reply: Sam Stoltze, Jan 12, 2015, 11:18 am

Submitting New Design Credits During Construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Charlie Haas on Jan 9, 2015, 3:41 pm

I am working on a project that underwent a split review. We have received and accepted our final design review submission. A short while after this, the owner decided that they would like to...

Last reply: Marcus Sheffer, Jan 12, 2015, 9:57 am

NC v2.2 Optional Misc. Documents on Project Summary DocumentsTab

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Heidi Sentivan on Jan 9, 2015, 1:03 pm

Hello,
We are getting ready to submit our combined NCv2.2 submission. I've uploaded the required documents in the project summary section including plans, elevation and sections that are...

Last reply: RETIRED, Jan 9, 2015, 4:52 pm

"Mixed C&D"

NC-2009 MRc2: Construction Waste Management
posted by Esmeralda Ward on Nov 13, 2014, 8:24 pm

On a current project under construction the contractor's waste hauler has been submitting monthly reports that have a list of materials on it, including Wood, Concrete, etc. One of these...

Last reply: Esmeralda Ward, Jan 9, 2015, 12:58 pm

The vent calcs indicate a total area significantly lessthan Plf2

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Matt Dem on Jan 8, 2015, 6:31 pm

Hi,
I received a comment for (Design Preliminary Submission) ventilation calculations indicate a total area (3,055 sqf) significantly less than plf2 (6219 sqf) for the IEQp1
Our...