Log in
Forum » U.S. and Canada
Topic

Integrated Project Team Members

Healthcare-v2009 IDp1: Integrated project planning and design
posted by Kim Lombard on Feb 11, 2015, 5:04 pm

Some of our team members have changed throughout the lengthy design and construction process of a Major Hospital. Should I list both names for the slot in the Integrated Project Team Members as...

Last reply: Susan Walter, Feb 12, 2015, 2:14 pm

IEQ c4.3 Flooring

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Rezkar Abdulmajeed on Nov 14, 2014, 1:21 pm

We have a project with some floor areas designed to be ceramic and quarry tiles.
Can someone advise if the two above need to meet floorscore standrads.

your comments are appreciated...

Last reply: Susan Walter, Feb 12, 2015, 9:06 am

MRc5 Material Tracking/Documentation

CS-2009 MRc5: Regional Materials
posted by Maggie Hogan Skaug on Feb 11, 2015, 11:45 am

RE: usgbc.org/leedonline, CS2009 MRc5
I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation. Please advise how this credit...

FSC Recycled-VS- FSC new wood

NC-2009 MRc7: Certified Wood
posted by Esther Kohout on Feb 10, 2015, 5:46 pm

It is my understanding that if you create a product made up of composite panels like...

Last reply: Esther Kohout, Feb 11, 2015, 10:24 am

Ill advised to submit EAp2 and EAc6 under combined review?

NC-2009 EAc6: Green Power
posted by Kathryn West on Feb 4, 2015, 10:31 am

If I submit for combined review and get comments on my energy model then my EAc6...

Last reply: Marcus Sheffer, Feb 10, 2015, 5:18 pm

Workspace opens to exterior and interior

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Peter Doo on Feb 9, 2015, 2:52 pm

We have a project that includes a workshop/studio space. This space will be used to construct small boats and other projects related to the organization's purpose which is marine environmental...

Last reply: Michelle Halle Stern, Feb 10, 2015, 9:42 am

Pre-Owned furniture

CI-2009 MRc4: Recycled Content
posted by Susan Di Giulio on Feb 6, 2015, 10:39 pm

If a project is using less than 30% of the furniture budget's worth of pre-owned furniture, and thus not attempting MRc3.2, can that be used towards MRc4 instead? I am thinking that it is not...

Last reply: RETIRED, Feb 7, 2015, 9:56 am

Reduction of impervious area

NC-2009 SSc6.2: Stormwater design - quality control
posted by Danielle Spicer on Feb 4, 2015, 4:17 pm

I have a project where we are promoting...

Last reply: Michael DeVuono, Feb 5, 2015, 10:46 am

Monitoring Period

Pilot-Credits EApc65: Monitoring based commissioning
posted by Mari Hamasaki on Feb 4, 2015, 1:36 pm

What is the required monitoring period for this credit?

Low-temperature chemical dishwashers

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Susan Di Giulio on Jan 31, 2015, 5:42 pm

The kitchen consultant on our project has specified a Hobart LT-1 LOW-TEMP CHEMICAL DISHWASHER. While most Hobart products are E-Star, this one is not. Is this type of dishwasher exempt as it...

Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Feb 2, 2015, 11:40 am