Storm dry pond onsite overflows to stormceptor

LEED Canada Forum
posted by Marie-France Duthilleul on May 27, 2015, 10:49 am

Pre condition - open field and grass, a few trees.

Post Condition: Development of a large military type vechicle building with loading docks and paved circulation drive area. Runoff from...

Does an indoor sewage pit need exahust for EQc5?

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Kristopher Lashley on May 25, 2015, 7:29 pm

We have a project where there is a sewage pit located on floor P2 of the parking garage. It's in a separate enclosed room and the question is whether or not it needs to be exhausted and included...

Last reply: Michelle Halle Stern, May 26, 2015, 9:34 am

Molok Containers for MRp1

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Kristopher Lashley on Oct 17, 2014, 1:28 pm

We are looking to install a 5000L Molok recycling bin for a LEED 2009 CS building that will be a restaurant. According to the reference guide a 11.6m recycling area would be required. However we...

Last reply: Deborah Lucking, May 18, 2015, 4:12 pm

calculating peak visitors for a multi-unit residential building

ND-v4 SLLc4: Bicycle facilities
posted by josee boutin on May 4, 2015, 5:04 pm

LEED 2009, would consider 10% of dwelling units or 4 (refer to SLLc4 equation 2) bicycle storage for visitors.
LEED v4 requires...

Last reply: Eliot Allen, May 12, 2015, 7:08 pm

ETS During Construction

NC-v4 EQp2: Environmental tobacco smoke control
posted by L W on Dec 16, 2014, 4:17 pm

Does the ETSC prerequisite apply during construction as well?

Last reply: Karin Miller, May 7, 2015, 6:09 pm

Manufacturer Declaration Letter

NC-2009 MRc4: Recycled Content
posted by Rezkar Abdulmajeed on May 3, 2015, 10:19 am

We completed the design of our project in 2013 and start construction in 2014. Some of the Declaration letters we received from the Manufacture (To Whom it may Concern) are dated before the start...

Last reply: RETIRED, May 4, 2015, 9:45 am

Requirements for recycle concrete

NC-2009 MRc4: Recycled Content
posted by Dw Barnes on Apr 6, 2015, 2:44 pm

RETIRED LEEDuser Expert 623 thumbs up April 10, 2015- 4:03 pm DW- I am not quite sure I understand your questions. There is no requirement to document the use of remanufactured concrete for the MR credits but you can include it for MRc4 and MRc5 (assuming the other site was within 500-miles of your site). Please review posts on this forum related to concrete and if your question is not answered, please revise and re-post it. Regarding what item it would be classified under, it depends on how the concrete is being used on your site. Tips: Go to the bottom of this page and click "Single-page...

Last reply: RETIRED, Apr 10, 2015, 4:03 pm

Previously Developed or Not

CS-2009 SSc1: Site Selection
posted by Kristopher Lashley on Mar 31, 2015, 7:38 pm

Our current project is located on a plot of land that 3/4 of it was developed into commercial retail. It "appears" that the last quarter had electricity and water mains laid out for a future...

Last reply: Jon Clifford, Mar 31, 2015, 10:31 pm

Point Structure For MRc5

NC-2009 MRc5: Regional Materials
posted by Robert Sherlock on Mar 17, 2015, 6:02 pm

Materials in particular, but that is an entirely different matter. See LEEDuser’s NCv4 MR forums for the Building Product Disclosure and Optimization credits.] Log in or register to post comments Robert...

Last reply: Jon Clifford, Mar 25, 2015, 10:49 pm

Does Revit daylight analysis satisfy CaGBC for IEQc8.1

NC-2009 IEQc8.1: Daylight and views - daylight
posted by ben chouinard on Mar 13, 2015, 6:06 pm

Can anyone confirm if the in-house plugin for Revit 2015 will be accepted for IEQc8.1 simulation?

Last reply: TODD REED, Mar 24, 2015, 8:29 am