Topic | Recent |
---|---|
No Brainer for projects with community programsPilot-Credits IPpc89: Social equity within the communityposted by Abby McDonald on May 19, 2022, 1:12 pm
The ownership of our project had several community programs, benifitting vulnerable populations near the project site. The Option 2 documentation template made it easy to provide the information... Last reply: Mauricio Ramirez, Mar 15, 2023, 9:46 pm |
|
How can the MRp2 Plan be accredited in an existing building that you want to certify?CS-v4 MRp2: Construction and demolition waste management planningposted by Carlos Bueno on Feb 6, 2023, 12:54 pm
A potential existing building (with two years to go) now wants to be LEED certified. The client has provided us with all the information on the design and construction of the building, but we... Last reply: Tiffany Beffel, Mar 15, 2023, 3:18 pm |
|
95 percentile calculationEBOM-v4.1 SSc1: Rainwater managementposted by Ann Pieper on Mar 14, 2023, 3:07 pm
The Rainfall Events Calculator, Historical Data tab, shows the 95th percentile storm calculation as a function of TOTAL ANNUAL Precipitation. Is that correct? Last reply: Ann Pieper, Mar 15, 2023, 1:34 pm |
|
Indoor Water use Fixtures CalculationsEBOM-v4 WEc2: Indoor water use reductionposted by Michael Abdelmessih on Mar 15, 2023, 12:25 pm
Hi everyone, I have a question today concerning the Indoor Water Use calculator for LEED... |
|
Question about Rainwater Tank volumeCS-v4 SSc4: Rainwater managementposted by Konstantina Kalliakoudi on Mar 15, 2023, 9:55 am
Hello LEED experts, I have a project with a small Open space, so the... |
|
Unregulated Electricity UsePilot-Credits EApc161: Electrification ACP: Energy Simulation Performance Pathposted by Zeynep Cakir on Mar 15, 2023, 9:32 am
Dear all, We are attempting this pilot credit but we are a little bit confused about the unregulated electricity input. It's asked to input the unregulated electricity in the LEED... |
|
showers required in retailRetail-NC-v4 LTc6: Bicycle facilitiesposted by Deborah Stadler on Mar 15, 2023, 9:10 am
For LEED v4 NC Retail are showers required? For LEED v4 CI Retail are showers required? The credit language and guide specifically appear to explicitly exclude showers in CI Retail, but not in... |
|
Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?NC-v4.1 LTc5: Access to quality transitposted by Zabdi Valdez on Mar 14, 2023, 6:01 pm
I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips. The park has an... |
|
Vestibules- CIR 10426- InterpretationNC-2009 EAp2: Minimum Energy Performanceposted by André Harms on Jul 1, 2016, 9:25 am
The... Last reply: Julio Fernandez Amodia, Mar 14, 2023, 4:51 pm |
|
Industrial FacilityPilot-Credits WEpc115: Whole Project Water Use Reductionposted by Jill Kurtz on Mar 18, 2021, 7:55 am
Anyone else attempt this credit as a large industrial facility? We did and even though our water saved is astronomically more (7000 times more) than in our flow flush, outdoor water use, we... Last reply: Chloe Bendistis, Mar 14, 2023, 3:55 pm |