Log in
Forum » NC-v4 EQc7
Topic

Exemptions or lower limits: Art Galeries (Museum)?

NC-v4 EQc7: Daylight
posted by Marilou Communeau on Nov 30, 2017, 6:48 am

Hello, I have a technical question about the credit Daylight for a Museum (with art galleries, offices, restaurant).
The project team claims that we shall never have more than 150LUX (...

Last reply: Calie Gihl, Feb 23, 2018, 2:57 pm

Daylight in manufacturing project

NC-v4 EQc7: Daylight
posted by Yodi Danusastro on Jan 24, 2018, 2:03 pm

I'm assessing for daylight in an industrial project. Like example, the only regularly occupied area is only 50m2, and the other 1000m2 is manufacturing area which not regularly occupied, perhaps...

Last reply: TODD REED, Jan 24, 2018, 2:23 pm

Manual or automatic glare-control devices

NC-v4 EQc7: Daylight
posted by Mugdha Mokashi on Aug 28, 2017, 2:28 pm

Is it absolutely essential to have manual or glare-control devices in all of the regularly occupied spaces? What if a few of the spaces do not have any manual or automatic shading but may be able...

Last reply: TODD REED, Jan 24, 2018, 7:36 am

Option 1: which software shall we use??

NC-v4 EQc7: Daylight
posted by Ricardo Sá on Jan 16, 2018, 7:52 am

Hi,

we're experiencing lots of difficulties to correctly assess this credit. Some notes:

- we're trying to guarantee compliance following option 1 (...

Last reply: Dane Sanders, Jan 16, 2018, 10:48 am

Option 1- ASE

NC-v4 EQc7: Daylight
posted by Sarah Leenknegt on Nov 7, 2017, 9:35 am

Dear all

I just wanted to check to be sure. We are assessing a building in Switzerland with electrochromic glazing. According to ID# 100002149, this counts as automated dynamic facade...

Building with similar floors and layout: simulation simplifications

NC-v4 EQc7: Daylight
posted by Ricardo Sá on Oct 27, 2017, 4:38 am

Hi,

I'm currently analysing a building with several levels with similar layouts and glazed areas. Since...

Last reply: SSN Energy Model, Oct 27, 2017, 5:15 am

Question about ASE study area

NC-v4 EQc7: Daylight
posted by Jackie Cheung on May 4, 2017, 11:04 pm

Hello everyone. May I ask 2 questions about this credit?

A) Assuming a project go for option 1. In...

Last reply: TODD REED, Aug 30, 2017, 2:27 pm

Shades and blinds

NC-v4 EQc7: Daylight
posted by Antonio Macedo Filho on Aug 16, 2017, 1:07 pm

I'm working on an office project, and there's an atrium. We want to use a translucent and permeable tensioning fabric on the roof of this atrium. Could this...

Last reply: TODD REED, Aug 17, 2017, 10:41 am

sDA simulation- window groups for core and shell buildings

NC-v4 EQc7: Daylight
posted by Diana Apro on Jul 26, 2017, 4:50 am

Dear All,

I have difficulties to define window groups for internal shading control when carrying out Option 1 (...

Last reply: Diana Apro, Jul 27, 2017, 3:20 am

Regularly Occupied Inspection Bay with Garage Roll-Up Doors

NC-v4 EQc7: Daylight
posted by Kristen Magnuson on Jul 24, 2017, 12:19 am

Daylighting Community,
We are working on a small building located on an airport campus called a Ground Transportation Unit (GTU). It building is used to inspect/repair ground vehicles used...

Last reply: TODD REED, Jul 24, 2017, 8:05 am