posted by Moses Chong on Jul 26, 2023, 5:43 pm

Hi! I'm working on a project in India. We cant obtain the utilities rates so we were trying to use the deafault EIA rates like other projects we did in the US. However it looks like EIA.gov does...

Last reply: Moses Chong, Jul 28, 2023, 11:14 am

Definition of a Laboratory Space

NC-v4 EAp2: Minimum Energy Performance
posted by Michael Hill on Jul 26, 2023, 6:24 pm

I am working on a project which is a facililty that tests tools used in semi-conductor fabrication facilities. The spaces are clean rooms with strict control of temperature, humidity, and...

Last reply: Marcus Sheffer, Jul 26, 2023, 7:02 pm

ASHRAE 90.1-2010 Table 6.8.1c

NC-v4 EAp2: Minimum Energy Performance
posted by study topenergy on Dec 20, 2021, 5:05 am

Hello, 

There are two Paths in ASHRAE 90.1-2010 Table 6.8.1c water chilling packages -Efficiency Requirement, just would like to know what is the different between path A and path B?

...

Last reply: phan vinh, Jul 4, 2023, 9:35 pm

Baseline System for Data center

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Jun 1, 2023, 7:07 pm

Hi All, I have read som many answers regarding  the baseline system for Data centers, Some are saying use system 8 some are saying use system 3 and 4, which one is the right system? I am working...

Last reply: Marcus Sheffer, Jun 15, 2023, 12:39 pm

Combining energy models for LEED application

NC-v4 EAp2: Minimum Energy Performance
posted by Dave Hubka on Jun 7, 2023, 1:13 pm

Hello Marcus, 

I have unique scenario in which I believe the answer is 'No' but cannot find a definitive answer. 

My project contains 6 floors of parking and 12 floors of...

Last reply: Cory Duggin, Jun 8, 2023, 11:09 am

Energy and Atmosphere

NC-v4 EAp2: Minimum Energy Performance
posted by PURUSHOTHAMAN on May 1, 2023, 1:37 am

Dear LEED Experts...

 I am involving one energy model work. It is factory production type Building.That project Installed equipments total power in KW-150. if i feed this total energy...

Last reply: Neeraj Sharma, May 6, 2023, 2:45 am

Group approach- Minimum requirement compliance

NC-v4 EAp2: Minimum Energy Performance
posted by Luis Andrade on May 2, 2023, 12:54 pm

Hello everyone!

I am working on 2 buildings that are registered in one project following the group approach.

We did not report the buildings seperatly on the MEPC in the first...

Last reply: Marcus Sheffer, May 3, 2023, 11:45 am

Landscape Exterior lighting LPD Mandatory provisions

NC-v4 EAp2: Minimum Energy Performance
posted by Julio Fernandez Amodia on Apr 25, 2023, 7:27 am

Hi there,

I am currently calculating the power allowance for exterior lighting in a school project.

In this case, there is quite a lot of exterior spaces and landscaping. Almost one...

Last reply: Neeraj Sharma, May 2, 2023, 2:34 am

DOAS with 2 energy wheel

NC-v4 EAp2: Minimum Energy Performance
posted by Mohamed Shehata on Apr 18, 2023, 3:31 am

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5867 thumbs up April 21, 2023- 7:11 pm This question is very software specific and is more appropriate for the software developer than for a LEED forum. Perhaps you want to restate it? Log in or register to post comments ...

Last reply: Marcus Sheffer, Apr 21, 2023, 7:11 pm

Setback Controls

NC-v4 EAp2: Minimum Energy Performance
posted by Samer Hassanie on Apr 4, 2023, 6:30 am

Hi,

In ASHRAE std. 90.1 2010 section 6.4.3.3.2 it is stated that systems shoud have controls that have the CAPABILITY to automatically restart and temporarily operate the...

Last reply: Marcus Sheffer, Apr 15, 2023, 9:58 am