Topic | Recent |
---|---|
Certification ProcessLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Luisa Scambia on Nov 26, 2021, 9:38 am
Hello LEEDUsers, Could you kindly confirm that my understanding of the LEED certification process/duration is correct:
|
|
Rating System SelectionLEED Rating System Selectionposted by Gloria Rozzini on Nov 11, 2021, 10:28 am
Good morning everyone, |
|
"ready for review" status in Design Final Review DecisionCS-2009 IDc2: LEED Accredited Professionalposted by sofia la cognata on Nov 10, 2020, 6:17 am
Good Morning, we have submitted this credit in the design review, but in the Design Final Review Decision the status is "ready for review" and not "anticipated" like the others. Can you... Last reply: Gloria Rozzini, Oct 29, 2021, 11:00 am |
|
Purchase green power contract for core and shellCS-v4 EAc7: Green power and carbon offsetsposted by Vincenzo Giacalone Biondo on Oct 26, 2021, 6:04 am
Hello everyone, Last reply: Marcus Sheffer, Oct 26, 2021, 2:36 pm |
|
piezometric tower as alternative water sourcesCS-v4 WEc2: Indoor water use reductionposted by Gloria Rozzini on Aug 5, 2021, 10:18 am
hello everyone. In one of our projects we have a piezomentric tower previously used as a process water. The water contained in this tower comes from the first water aquifer (therefore not potable... Last reply: Michael Yi, Aug 5, 2021, 9:10 pm |
|
Rainwater Collected for IrrigationNC-v4 SSc4: Rainwater managementposted by Andrea Valentini on Apr 2, 2019, 6:47 amHashir Usman LEEDuser Basic Member May 5, 2020- 8:18 am Hi Andrea, LEED Guide says ''All runoff from the chosen percentile of precipitation events must be managed such that there is no surface discharge from the site. Techniques include, but are not limited to, infiltration, storage and re-use, bioretention, open-grid pavement, and the reduction of impervious area.'' So, I guess it is to use all those techniques that best mimic the natural hydrological conditions before any development occurred. And I read it in this forum that only storing and reusing the runoff volume does not comply... Last reply: Shannon Oletic, Jul 2, 2021, 9:42 am |
|
glare-control devices for C&SCS-v4.1 EQc4: Daylightposted by Francesco Passerini on Jul 15, 2019, 10:32 am
Hello, the reference guide states: "Provide manual or automatic (with manual override) glare-control devices for all regularly occupied spaces". Is that mandatory for spaces occupied by... Last reply: Dave Hubka, Jun 3, 2021, 4:22 pm |
|
ventilation of unconditioned warehouseNC-v4 EAp2: Minimum Energy Performanceposted by Francesco Passerini on May 4, 2021, 6:14 am
Is the ventilation of a unconditioned warehouse considered... Last reply: Marcus Sheffer, May 14, 2021, 3:35 pm |
|
Condenser heat recovery pumpHealthcare-v2009 EAc1: Optimize Energy Performanceposted by Davide Liviero on Apr 23, 2021, 3:12 am
Hello everyone, I am modeling a hospital which is served by district coooling, which I am modeling using Option 2 of the guidance (... |
|
Green EducationCS-v4 INc1: Innovationposted by Gloria Rozzini on Mar 12, 2021, 11:49 am
We are pursuing the green education innovation credit. We were wondering if in lieu of a site visit (not practicable with the current pandemic) we can prepare articles/presentations of the site... Last reply: Azfar Mohamed, Apr 2, 2021, 10:39 pm |