Log in
Forum » Thailand
Topic

Baseline HVAC system choice

NC-2009 EAp2: Minimum Energy Performance
posted by Jatuwat Varodompun on May 25, 2015, 8:20 pm

Let's Say this building is 26,000 sf which the baseline is system 5-6. What if the exception area is 10,000 sf (process load difference >10...

Last reply: Marcus Sheffer, May 26, 2015, 11:02 am

Fuel types of process energy

NC-2009 EAp2: Minimum Energy Performance
posted by Jatuwat Varodompun on May 8, 2015, 11:38 am

We have a new plant using NGV as a fuel to fry potato chip in Thailand. The exact similar technology was used in another plant in China (same potato chip brand) which is already LEED gold...

Last reply: Jatuwat Varodompun, May 8, 2015, 9:23 pm

SHGC Value ASHRAE 90.1-2007

NC-2009 EAp2: Minimum Energy Performance
posted by John Covello on Apr 9, 2015, 7:17 am

Hello everyone,

Are the maximum...

Last reply: Marcus Sheffer, Apr 9, 2015, 10:14 am

Process Load of a factory applying LEED CS

CS-2009 EAp2: Minimum Energy Performance
posted by Jatuwat Varodompun on Mar 31, 2015, 10:51 am

I have a factory to be built for rent. Thus, this project goes for CS since we only build the shell. However, since we don't know the detail of a machine to be used (depend on the future tenant/...

Last reply: Marcus Sheffer, Mar 31, 2015, 11:32 am

Daylight dimming with manual electric curtain

NC-2009 EAp2: Minimum Energy Performance
posted by Jatuwat Varodompun on Mar 30, 2015, 12:59 pm

My project has a dayligh dimming system and alos the curtain of each window. The reviewer ask me to add the effect of how this curtain will be modeled. Normally this curtain will be operated by...

Last reply: Marcus Sheffer, Mar 31, 2015, 10:25 am

Air Curtain in conditioned space

NC-2009 EAp2: Minimum Energy Performance
posted by Jatuwat Varodompun on Mar 30, 2015, 12:54 pm

How should we model the air curtain at the building entrance? Should we model as process load for both baseline and proposed?

Last reply: Jatuwat Varodompun, Mar 30, 2015, 9:20 pm

How can I filled the LEED Online form

CS-2009 WEc3: Water Use Reduction
posted by Somsak Jidmon on Mar 10, 2015, 3:37 am

My current CS Project using the water saving fixtures and saving the water up to 36% Reduction and our project will used the gray water from waste water treatment plant for all the flush fixtures...

Last reply: Somsak Jidmon, Mar 10, 2015, 12:16 pm

Precision Air Conditioning for Server Room and Art Gallery

NC-2009 EAp2: Minimum Energy Performance
posted by Panupant Phapant on Mar 4, 2015, 9:31 am

Dear All
We have two projects that are attempting LEED 2009 NC Certification the first one is office building with server room and the second one is Arg Gallery. Both projects use precision...

Last reply: Panupant Phapant, Mar 5, 2015, 9:34 pm

Acceptable thermal conditions in naturally conditioned spaces

NC-2009 IEQc7.1: Thermal comfort - design
posted by Panupant Phapant on Jan 27, 2015, 3:10 am

There is a cafeteria where the HVAC designer of record intends to have it naturally conditioned. According to ASHRAE 55-2004, naturally conditioned spaces must be equipped with operable windows...

Envelope materials with no provided u-values

NC-2009 EAp2: Minimum Energy Performance
posted by John Covello on Jan 22, 2015, 5:08 am

Hello,

On our project we are getting supplied from local contractors materials like sandstone, granite, reused teak...

Last reply: Marcus Sheffer, Jan 22, 2015, 4:50 pm