Reclaim land for more than 40 yearsNC-v4 MPR1: Must be in a permanent location on existing landposted by Michael Wahjudi on May 19, 2015, 9:05 pm
"All LEED projects must be constructed and operated on a permanent location on existing land" from these statement. It is clearly indicate that LEED project at reclaim land is not allowed for... Last reply: Tristan Roberts, Mar 16, 2016, 11:59 am |
|
ASHRAE 90.1 2007 vs 2013NC-2009 EAp2: Minimum Energy Performanceposted by Michael Wahjudi on Mar 14, 2016, 8:52 pm
Hi all. Can we use latest standard of ASHRAE 90.1 2013 instead of 2007 as stipulated at reference guide? Noted that the latest standard will have more stringent requirement. Last reply: Marcus Sheffer, Mar 15, 2016, 9:59 pm |
|
Private bus line for public use?NC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Michael Wahjudi on Mar 2, 2016, 1:46 am
Hi all, I have received reply from LEED reviewer stating that "campus or private bus line that falls within onequarter mile of the project site must provide transportation service to the public... Last reply: Michael Wahjudi, Mar 2, 2016, 9:14 pm |
|
Water Heater and Water CoolersCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Shuchita Gupta on Jan 26, 2016, 8:16 am
Hi , Are Water Heaters ( under a separate Water heater category ) and water cooler ( under others category ) under energy star website require energy star compliance , since the... Last reply: Shuchita Gupta, Feb 5, 2016, 12:06 am |
|
Site Surrounding that Partially DevelopedNC-2009 SSc2: Development Density and Community Connectivityposted by Michael Wahjudi on Aug 14, 2015, 2:49 am
Our project is located at site that the surrounding site partially already developed and able to meet the development... Last reply: Marilyn Specht, Jan 12, 2016, 9:47 pm |
|
LEED CS building with very minimum landlord provisionCS-2009 EAp2: Minimum Energy Performanceposted by Michael Wahjudi on Dec 10, 2015, 11:27 pm
Hi all, I have LEED CS with very minimum client provision without AC systems (only emergency lights, emergency fans and lifts). But the main tenant has been agreed from the building and the... Last reply: Michael Wahjudi, Dec 15, 2015, 2:07 am |
|
G6.5.3.1-2 Pressure Drop Adjustment by SpaceData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Rajesh Balachander on Dec 3, 2015, 3:49 am
Hi Marcus Would like to check. My space has FA system fan, Recirculating Air Fan and also Exhaust air fan. Can I use the table for adjustments. My question is since Fresh air and exhaust... Last reply: Marcus Sheffer, Dec 4, 2015, 2:52 pm |
|
ATM and Driving SchoolNC-2009 SSc2: Development Density and Community Connectivityposted by Michael Wahjudi on Sep 24, 2015, 9:32 pm
Hi all, need to get some guidance here. Can ATM considered as "bank"? Since the ATM is having full capability of banking services, except opening bank account. Additionally, can driving school... Last reply: Michelle Robinson Schwarting, Sep 28, 2015, 10:34 am |
|
Data Center Baseline HVAC System with Ancillary Office SpacesData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Rajesh Balachander on Jun 4, 2015, 1:54 am
Hi Marcus Your comments and Suggestions were valuable for my understanding on doing my LEED EM for Data Center. I would like to confirm on my understanding. I have a 7 storey building of... Last reply: Marcus Sheffer, Jun 10, 2015, 9:06 am |
|
Brownfield site but graded before the construction startedNC-2009 SSc3: Brownfield Redevelopmentposted by Michael Wahjudi on Jun 2, 2015, 3:47 am
Our site is brownfield (existing navy base), but the site is being graded before 1980 to be prepared as industrial area. The current construction activity start at 2014. Can we still consider our... Last reply: Michael Wahjudi, Jun 9, 2015, 12:02 am |