Topic | Recent |
---|---|
Replace All Filtration MediaEBOM-2009 IEQc1.5: Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by Ran Zhang on Jun 14, 2016, 2:36 am
Hi I am working on a project located in Tokyo Japan. We are aiming to pursue IEQ c1.5 and thinking about the requirements regarding the filtration media replacement right now. As replacing all... Last reply: Trista Brown, Jun 14, 2016, 3:02 pm |
|
Non-direct Purchase ItemEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Ran Zhang on Apr 26, 2016, 2:15 am
The project I am working for does not pay for any toner cartridges as they are included in the maintenance contract. In this case, shall we count it zero or need to get the standard price if they... |
|
CCHP ModelingNC-2009 EAp2: Minimum Energy Performanceposted by Jie Shen on Apr 22, 2016, 5:04 am
Consultant ERM Apr 20 2016 Guest CCHP System modeling Project Location: Japan My project is provided by CCHP system which owned by third party, the CCHP... Last reply: Marcus Sheffer, Apr 25, 2016, 3:28 pm |
|
CCHP System modelingNC-2009 EAp2: Minimum Energy Performanceposted by Jie Shen on Apr 20, 2016, 10:07 pm
My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat recovered gas absorption chiller, two normal chillers and two boilers. |
|
US standard and red cross:posted by Takayuki Hirota on Feb 10, 2016, 4:25 am
I have a project in Japan that may use this pilot credit. But I need more clarification and information in the credit requirements: i) What U.S. standard and which part of it do we need to... Last reply: Takayuki Hirota, Mar 16, 2016, 8:43 pm |
|
Roof area covered 90% by equipmentEBOM-2009 SSc7.2: Heat island effect - roofposted by Ran Zhang on Nov 17, 2015, 6:23 pm
Hi, I am working on a 10 floors office project building in Japan. For... Last reply: Ran Zhang, Feb 24, 2016, 9:22 pm |
|
Top and trimNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Noriko Nagazumi on Jan 18, 2016, 8:29 pm
What are top and trim adhesives? Looking up the internet, it seems to be an automotive spray type adhesive. Why does it show up in this architectural adhesive list? Is it correct to list spray... Last reply: Noriko Nagazumi, Jan 19, 2016, 10:28 pm |
|
Number of chillers in Energy ModelData-Centers-NC-v4 EAc2: Optimize Energy Performanceposted by Izumi Takayama on Nov 10, 2015, 3:29 am
Hi, Last reply: Marcus Sheffer, Nov 10, 2015, 10:03 am |
|
Runoff rate and runoff volume definitionCS-2009 SSc6.1: Stormwater design - quantity controlposted by Noriko Nagazumi on Oct 26, 2015, 9:52 pm
Michael, Our local regulations usually require rainwater collection facilities that only shift the total runoff between storms instead of infiltrating or reusing the rainwater. Is... Last reply: Michael DeVuono, Oct 28, 2015, 7:32 am |
|
ACP Revised Points ThresholdsCS-2009 EAp2: Minimum Energy Performanceposted by Takayuki Hirota on Oct 23, 2015, 2:22 am
We have a C&S project and are planning the energy simulation for EAp2 and EAc1. I think we can use ACP revised points thresholds for our project, but would like to make sure if there are any... Last reply: Takayuki Hirota, Oct 26, 2015, 8:00 pm |